Permit: T22CM04554
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3200 E VALENCIA RD
Address NEW:
3200 E VALENCIA RD
Apply Date:
06/17/2022
Applicant:
Miriam Desroches
Description:
New build from ground up, Tropical Smoothie Cafe
Permit Reviews
Permit Number - T22CM04554
Permit Status: Complete
Permit Description: New build from ground up, Tropical Smoothie Cafe
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/17/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 08/09/2022 | COMPLETED |
| 08/09/2022 | RESUBMITTAL | 08/18/2022 | COMPLETED |
| 10/01/2022 | REVISION - - 1ST | 10/18/2022 | COMPLETED |
| 03/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/29/2023 | APPROVED |
| 03/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/20/2023 | APPROVED |
| 04/11/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/23/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM04554
Permit Status: Complete
Permit Description: New build from ground up, Tropical Smoothie Cafe
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/16/2022 | SHOP DRAWINGS REQUIRED FOR SIGNAGE. |
Conditions
Permit Number - T22CM04554
Permit Status: Complete
Permit Description: New build from ground up, Tropical Smoothie Cafe
| Date | Description | Comments |
|---|---|---|
| 08/18/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 08/16/2022 | SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION. | |
| 08/16/2022 | SPECIAL INSPECTION IS REQUIRED FOR AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION. | |
| 08/18/2022 | DO NOT ISSUE PERMIT TILL DP22-0078 HAS BEEN ISSUED. | |
| 08/18/2022 | Prior to permit issuance a General Contractor Letter (GCL) is required | |
| 08/18/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF PERMIT. | |
| 03/29/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/22/2023 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 03/29/2023 | Post-Installed Anchor Inspection Report is required. | |
| 03/29/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04554
Permite Description: New build from ground up, Tropical Smoothie Cafe
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Sewer | N/A | Not Ready | |
| 12/02/2022 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | |
| 03/28/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 03/28/2023 | COT - LCBU - Sustainability | N/A | Not Applicable | |
| 03/28/2023 | COT - LCPL - Gas Pressure Test | N/A | Not Applicable | |
| 01/25/2023 | COT - LCEL - Electrical Underground | N/A | Partial Pass | 2 secondary conduits (2 1/2”)from service entrance to transformer approved to cover |
| 10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
| 04/05/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Needs fire extinguisher. |
| 04/06/2023 | COT - LCEL - Electrical Final | N/A | Canceled | |
| 04/06/2023 | COT - LCEL - Outdoor Lighting | N/A | Canceled | |
| 04/06/2023 | COT - LCBU - Building Final | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04554
Permit Description: New build from ground up, Tropical Smoothie Cafe
Total Completed Inspections - 29
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved, okay for concrete placement} | |
| 10/14/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 10/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved sanitary and grease lines within building pad, okay to backfill} | |
| 11/09/2022 | COT - LCBU - Roof Nailing | Passed | ||
| 12/02/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 12/02/2022 | COT - LCEL - Electrical Intermediate | Passed | ||
| 12/09/2022 | COT - LCPL - Plumbing Progress | Passed | ||
| 12/09/2022 | COT - LCPL - Plumbing Roof Drains | Passed | ||
| 12/09/2022 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 12/09/2022 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 12/09/2022 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 01/06/2023 | COT - LCPL - Sewer | Passed | All exterior pvc to sewer tie-in ok. | |
| 01/19/2023 | COT - HCPL - Sewer | Passed | 15’ finished tie into the sewer near grease trap. okay to backfill. shading required. | |
| 01/19/2023 | COT - LCPL - Backwater Valve | Passed | n/a | |
| 01/20/2023 | COT - LCPL - Plumbing Final | Passed | waterline connected and under 50# pressure. okay to shade piping and backfill. | |
| 02/10/2023 | BULD - Electrical Clearance | Passed | all panels are good. service entrance is good. okay to energize system. | |
| 03/02/2023 | COT - LCBU - Building Above Ceiling | Passed | Ok to set ceiling tiles. | |
| 03/02/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
| 03/28/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 03/28/2023 | COT - LCBU - Framing | Passed | ||
| 03/30/2023 | COT - LCEL - Electrical Underground | Passed | ||
| 04/05/2023 | COT - LCME - Mechanical Final | Passed | 4-5-23: Mechanical equipment is installed and operational. All ductwork is installed with registers attached. | |
| 04/06/2023 | COT - FCON - Fire - Final | Passed | ||
| 04/14/2023 | COT - LCEL - Electrical Final | Passed | 4-14-23: Fuses on walk-in cooler have been corrected. All electrical panels are properly labeled. GFCI outlets are were they are required. | |
| 04/14/2023 | COT - LCEL - Outdoor Lighting | Passed | 4-14-23: Outdoor Lighting is complete | |
| 04/14/2023 | COT - LCBU - Building Final | Passed | 4-14-23: ADA restroom sink has been lowered to the correct height. Site Engineering, Health Department, Zoning, and Fire Department inspections have all been completed. Construction is complete. Okay to issue a Level 4 Certificate of Occupancy. | |
| 04/14/2023 | COT - LCBU - Building Progress | Passed | ||
| 04/14/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 04/14/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 04/14/2023 | COT - HCBU - CofO | Passed | 4-14-23: ADA restroom sink has been lowered to the correct height. Site Engineering, Health Department, Zoning, and Fire Department inspections have all been completed. Construction is complete. Okay to issue a Level 4 Certificate of Occupancy. |