Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/09/2022
Applicant:
Michael Baird
Description:
Reataurant (48 occ)/Brewery (11 occ)/Outdoor Seating (62 occ)

Permit Reviews

Permit Number - T22CM04300
Permit Status: Complete
Permit Description: Reataurant (48 occ)/Brewery (11 occ)/Outdoor Seating (62 occ)
Start Date Submittal Complete Date Status  
06/09/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 07/21/2022 COMPLETED Review Details
07/28/2022 RESUBMITTAL 08/08/2022 COMPLETED Review Details
09/06/2022 RESUBMITTAL 09/29/2022 COMPLETED Review Details
05/10/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/24/2023 APPROVED Review Details
09/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/28/2023 APPROVED Review Details

Conditions

Permit Number - T22CM04300
Permit Status: Complete
Permit Description: Reataurant (48 occ)/Brewery (11 occ)/Outdoor Seating (62 occ)
Date Description Comments
09/29/2022 WATER CHLORINATION REPORT (Prior to TCO)
09/29/2022 AIR BALANCE REPORT
09/29/2022 PIMA COUNTY HEALTH DEPARTMENT SIGN OFF REQUIRED PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM04300
Permite Description: Reataurant (48 occ)/Brewery (11 occ)/Outdoor Seating (62 occ)
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
04/12/2023 TRSP - ROW - Final/Close-Out N/A Not Applicable
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
03/20/2023 ENGR Engineering Final N/A Not Ready Met with a contractor on site to discuss what are their plans? I have advised them to contact the engineer record and get revisions submitted to engineering and zoning so that they can be partially approved and the work and continue. I will not be able to accept anything that they have suggested at this time until it has been proved by the reviewers for the site
05/10/2023 COT - LCBU - Building Final N/A Not Ready Fire inspections are not complete. Will reschedule upon completion of Fire inspections.
05/11/2023 COT - FCON - Fire - Final N/A Partial Pass Ok for Level 4 TCO.
Still waiting on Fire Alarm Permits.
08/31/2023 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T22CM04300
Permit Description: Reataurant (48 occ)/Brewery (11 occ)/Outdoor Seating (62 occ)
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/12/2023 COT - LCPL - Rough Soil Passed
03/17/2023 COT - LCPL - Plumbing Intermediate Passed Ok to insulate and cover the walls
03/28/2023 COT - LCEL - Electrical Intermediate Passed
04/06/2023 COT - LCPL - Gas Pressure Test Passed New gas service to building.
05/03/2023 COT - LCME - Mechanical Final Passed
05/03/2023 COT - LCPL - Plumbing Final Passed
05/03/2023 COT - LCEL - Electrical Final Passed
05/11/2023 ENGR Engineering Final Passed N/A
05/11/2023 PDSD Site/Engineering Division - Landscaping Passed N/A
05/23/2023 COT - LCBU - Building Final Passed
08/30/2023 COT - FCON - Fire - Final Passed
08/30/2023 COT - FCON - Alarm - Final Passed
08/30/2023 COT - FCON - Sprinkler - Final Passed
08/31/2023 COT - ENGR - Site - Assurance Release Passed
08/31/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
08/31/2023 COT - LCBU - Preslab Passed
08/31/2023 COT - LCBU - Building Above Ceiling Passed
08/31/2023 COT - LCEL - Outdoor Lighting Passed
08/31/2023 COT - LCME - Mechanical Intermediate Passed
08/31/2023 COT - LCBU - Framing Passed
08/31/2023 COT - LCEL - Electrical Progress Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECH CHECK 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 4300 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SYSTEM DESIGN REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CERTIFICATE OF CONDITIONAL APPROVAL_V1.PDF DOCUMENTS VIEW
CONS-PLAN SET APPROVED_V1.PDF DOCUMENTS VIEW
SCREWBEAN BREWERY-WATER TEST REPORT-2023-05-08_V1.PDF DOCUMENTS VIEW
AIR BALANCE REPORT SCREWBEAN T22CM04300_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
MECH CHECK.PDF DOCUMENTS VIEW
PERMIT 4300.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SYSTEM DESIGN REPORT.PDF DOCUMENTS VIEW