Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - T22CM04300
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
03/17/2023 | ENGR Engineering Final | Not Ready | Site meeting with the contractor, discuss current conditions and how they can meet the ADA compliancy for the site. I have advised the contractor that they need to have the engineer record with zoning and engineering reviewers downtown to discuss this site. | |
03/20/2023 | ENGR Engineering Final | Not Ready | Met with a contractor on site to discuss what are their plans? I have advised them to contact the engineer record and get revisions submitted to engineering and zoning so that they can be partially approved and the work and continue. I will not be able to accept anything that they have suggested at this time until it has been proved by the reviewers for the site | |
05/10/2023 | ENGR Engineering Final | Partial Pass | Shawn on site. Provide city approved site plans. Install wheel stop and complete remainder of work. Engineering has no issuesissues that would prevent a temporary certificate of occupancy |
|
05/11/2023 | ENGR Engineering Final | Passed | N/A |