Permit: T22CM03838
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1237 E DRACHMAN ST
Address NEW:
1237 E DRACHMAN ST
Apply Date:
05/19/2022
Applicant:
Description:
(T21DV08921) Fire restoration of Condo Unit.
Permit Reviews
Permit Number - T22CM03838
Permit Status: Complete
Permit Description: (T21DV08921) Fire restoration of Condo Unit.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/19/2022 | OTHER | 06/16/2022 | COMPLETED |
| 06/22/2022 | RESUBMITTAL | 06/28/2022 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03838
Permite Description: (T21DV08921) Fire restoration of Condo Unit.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2022 | COT - LCBU - Building Progress | N/A | Re-inspection required | Field contact information is not accurate and the site is locked |
| 11/10/2022 | COT - LCEL - Electrical Intermediate | N/A | Re-inspection required | field contact info not accurate site locked |
| 11/10/2022 | COT - LCME - Mechanical Intermediate | N/A | Re-inspection required | Fill contact information inaccurate and site is locked |
| 11/10/2022 | COT - LCBU - Building Above Ceiling | N/A | Re-inspection required | Field contact information is not accurate and the site is locked |
| 11/10/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Re-inspection required | Field contact information is not accurate and the site is locked |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03838
Permit Description: (T21DV08921) Fire restoration of Condo Unit.
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2022 | COT - LCBU - Building Progress | Passed | ||
| 11/17/2022 | COT - LCEL - Electrical Intermediate | Passed | ||
| 11/17/2022 | COT - LCME - Mechanical Intermediate | Passed | ||
| 11/17/2022 | COT - LCBU - Building Above Ceiling | Passed | ||
| 11/17/2022 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 11/17/2022 | COT - LCBU - Framing | Passed | ||
| 12/21/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 12/21/2022 | COT - LCPL - Gas Pressure Test | Passed | ||
| 12/21/2022 | COT - BULD - SWG Clearance | Passed | ||
| 03/17/2023 | BULD - Electrical Clearance | Passed | Electrical panel is installed, with new 100 amp disconnect at meter location. | |
| 03/17/2023 | COT - LCBU - Building Final | Passed | Building is complete and ready for occupancy. Okay to issue a Level 4 C of O. | |
| 03/17/2023 | COT - LCEL - Outdoor Lighting | Passed | Exterior lights are installed and meet city code for light ordinance. | |
| 03/17/2023 | COT - LCEL - Electrical Final | Passed | All electrical outlets are installed. | |
| 03/17/2023 | COT - LCME - Mechanical Final | Passed | New A/C unit is installed. All ductwork and registers are installed. |