Permit: T22CM03775
Permit Details
Status:
In Revision
Type:
Residential Building - One or Two Family
Address:
3229 E WAVERLY ST
Address NEW:
3229 E WAVERLY ST
Apply Date:
05/17/2022
Applicant:
Description:
Sleeping Quarters
Permit Reviews
Permit Number - T22CM03775
Permit Status: In revision
Permit Description: Sleeping Quarters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/17/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/10/2022 | COMPLETED |
| 07/19/2022 | RESUBMITTAL | 07/19/2022 | COMPLETED |
| 12/07/2022 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/15/2022 | APPROVED |
Conditions
Permit Number - T22CM03775
Permit Status: In revision
Permit Description: Sleeping Quarters
| Date | Description | Comments |
|---|---|---|
| 05/24/2022 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
| 05/24/2022 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
| 05/24/2022 | FUP T22OT00357 MUST BE PAID BEFORE FINAL INSPECTIONS. | |
| 05/24/2022 | FUP T22OT00357 MUST BE PAID BEFORE FINAL INSPECTIONS. | |
| 05/24/2022 | FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. |
Outstanding Inspections
Permit Status: In Revision
Permit Number: T22CM03775
Permite Description: Sleeping Quarters
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 07/19/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 07/19/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 07/19/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
Completed Inspections
Permit Status: In Revision
Permit Number: T22CM03775
Permit Description: Sleeping Quarters
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/20/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 09/20/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/20/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/13/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Denied: 1-Setbacks are less then shown on approved plans. 2-Ufer is not installed. 3-Some piping has negative slope. } |
|
| 10/17/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} | |
| 11/14/2022 | COT - RSPL - Yard Water Line | Passed | ||
| 11/14/2022 | COT - RSEL - Electrical Underground | Passed | ||
| 11/14/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/14/2022 | COT - RSPL - Rough Soil | Passed | ||
| 11/23/2022 | COT - LCBU - Framing | Passed | ||
| 11/23/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/25/2023 | COT - RSEL - Electrical Final | Passed | electrical is complete. | |
| 01/25/2023 | COT - RSPL - Plumbing Final | Passed | all fixtures are installed and operational. | |
| 01/25/2023 | COT - RSME - Mechanical Final | Passed | mechanical is operational. | |
| 01/25/2023 | RSBU - Building Final | Passed | building is complete and ready for C of O. | |
| 01/25/2023 | COT - RSEL - Outdoor Lighting | Passed | outside fixtures meet standards. |