Permit: T22CM03576
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2141 E IRENE VISTA
Address NEW:
2141 E IRENE VISTA
Apply Date:
05/10/2022
Applicant:
Inai Maldonado
Description:
R-Fire Damage Repair; Bedroom Addition and Enclose Carport
Permit Reviews
Permit Number - T22CM03576
Permit Status: Complete
Permit Description: R-Fire Damage Repair; Bedroom Addition and Enclose Carport
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/10/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 05/31/2022 | COMPLETED |
| 06/04/2022 | RESUBMITTAL | 06/24/2022 | COMPLETED |
Conditions
Permit Number - T22CM03576
Permit Status: Complete
Permit Description: R-Fire Damage Repair; Bedroom Addition and Enclose Carport
| Date | Description | Comments |
|---|---|---|
| 06/13/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 06/23/2022 | FUP T22OT00392 MUST BE PAID BEFORE FINAL INSPECTIONS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03576
Permite Description: R-Fire Damage Repair; Bedroom Addition and Enclose Carport
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSEL - Service Upgrade | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 06/30/2023 | RSBU - Building Final | N/A | Re-inspection required | 6/30/23: 1)light in master closet not functioning. Missing water hammer arresters at washing machine and refrigerator. 3) smoke alarm missing in East bedroom. 4) outdoor receptacles need to be (WR) for protection against weather. |
| 01/31/2023 | COT - RSEL - Electrical Final | N/A | Canceled | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03576
Permit Description: R-Fire Damage Repair; Bedroom Addition and Enclose Carport
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 07/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 07/12/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 07/12/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 07/21/2022 | COT - RSBU - Preslab | Passed | {Activity date: 07/21/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/19/2022; Status: Continued; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - CORRECTIONS REQUIRED, Finish installing form boards, dig up existing footings to ensure correct depths, finish plumbing wrap, and provide approved plan set on site.} | |
| 08/19/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
| 08/25/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 08/25/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 08/19/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready} | |
| 10/04/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Approved} | |
| 10/04/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Approved} | |
| 10/04/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/20/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor} ; {Activity date: 08/25/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Per intermediates. Maintain 10’ clearance from vent pipe to air intake. Missing anchor bolts. Missing studs to support girders. Adjust fire blocking. } |
|
| 10/04/2022 | RSME - Mechanical Progress | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Approved} | |
| 10/04/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/04/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Approved} | |
| 01/31/2023 | COT - RSEL - Service Upgrade | Passed | Approved, panel was relocated to new construction- INCR Clearance to TEP is required for the cutover (Existing service panel on pole) |
|
| 01/31/2023 | BULD - Electrical Clearance | Passed | INCR Clearance to TEP is required for the cutover | |
| 06/30/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/30/2023 | COT - RSME - Mechanical Final | Passed | ||
| 07/28/2023 | RSBU - Building Final | Passed | ||
| 07/28/2023 | COT - RSEL - Electrical Final | Passed | ||
| 07/28/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 10/16/2023 | COT - RSPL - Gas Final | Passed | ||
| 10/16/2023 | COT - BULD - SWG Clearance | Passed | Approved gas piping to meter, SWG clearance is required for reconnection | |
| 10/16/2023 | COT - RSPL - Gas Pressure Test | Passed |