Permit: T22CM03468
Permit Details
Apply Date:
05/06/2022
Applicant:
Description:
New Commercial Shell Bldg
Permit Reviews
Permit Number - T22CM03468
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/06/2022 | 3RD PARTY REVIEW - COMMERCIAL | 07/21/2022 | COMPLETED |
03/01/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/24/2023 | REQUIRES RESUBMIT |
01/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/19/2024 | APPROVED |
12/20/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/21/2023 | APPROVED |
12/19/2023 | COMMERCIAL REVIEW - FULL v.2 | 12/20/2023 | APPROVED |
Conditions
Permit Number - T22CM03468
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Date | Description | Comments |
---|---|---|
06/28/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
06/28/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
06/28/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
06/28/2022 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
06/28/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
06/28/2022 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
06/28/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/28/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
07/21/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
06/28/2022 | SHOP DRAWINGS REQUIRED FOR WOOD I JOISTS. | |
07/21/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
12/21/2023 | SPECIAL INSPECTION FOR EFIS IS REQUIRED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03468
Permite Description: New Commercial Shell Bldg
Total Outstanding Inspections - 12
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/28/2022 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | Partial for SW-2 wall hold-downs located at the front walls of Bldg 26 |
03/27/2023 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
03/27/2023 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
06/08/2023 | COT - LCBU - Sustainability | N/A | Not Applicable | |
06/08/2023 | COT - LCEL - Construction Power | N/A | Not Applicable | |
07/26/2023 | BULD - Electrical Clearance | N/A | Not Applicable | duplicate inspection |
07/26/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | gas final and clearance shall be addressed with TI permit |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03468
Permit Description: New Commercial Shell Bldg
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/11/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/29/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for 4” grease and sanitary lines within the building, okay to backfill progress areas} | |
10/11/2022 | COT - LCPL - Sewer | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved 4" soil connected to on-site private main, okay to backfill progress areas } |
|
10/18/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
10/18/2022 | COT - LCBU - Preslab | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
10/18/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
11/15/2022 | COT - LCBU - Framing | Passed | ||
12/05/2022 | COT - LCBU - Roof Nailing | Passed | ||
12/05/2022 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
12/06/2022 | COT - FCON - Underground Flush | Passed | Subcontractors permit approved on 6/27/22 by J. Fordney. | |
12/08/2022 | COT - FCON - Underground Pressure | Passed | Approved on subcontractors permit on 6/20/22 by J. Vincent. | |
12/22/2022 | COT - LCPL - Plumbing Roof Drains | Passed | ||
04/06/2023 | COT - LCPL - Plumbing Intermediate | Passed | Gas line inspected and approved | |
05/25/2023 | COT - LCPL - Plumbing Final | Passed | ||
05/25/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
05/25/2023 | COT - LCEL - Electrical Final | Passed | ||
06/02/2023 | COT - FCON - Sprinkler - Final | Passed | ||
06/02/2023 | COT - FCON - Alarm - Final | Passed | ||
06/02/2023 | COT - FCON - Fire - Final | Passed | ||
06/08/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
06/08/2023 | COT - LCBU - Building Final | Passed |