Inspection Status: Not Ready
Inspection History: COT - LCEL - Electrical Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - LCEL - Electrical Intermediate |
|
Not Ready |
|
| 09/21/2022 |
COT - LCEL - Electrical Intermediate |
JBURGE |
Partial Approval |
Entered by VVERA1 - Partial. Electric underground: Secondary conduits for three spaces; line for Temporary transformer and power lines to units: 3 each 4” conduits; 5 each 2 1/2” conduits; 4 each 1 1/2” conduits. Ok to cover progress areas. |
| 03/27/2023 |
COT - LCEL - Electrical Intermediate |
|
Not Ready |
|
| 04/19/2023 |
COT - LCEL - Electrical Intermediate |
|
Not Ready |
|
| 05/25/2023 |
COT - LCEL - Electrical Intermediate |
|
Not Applicable |
|