Permit: T22CM03375
Permit Details
Apply Date:
05/04/2022
Applicant:
Ben Smith
Description:
SFR F60C22 T22-M0020
Permit Reviews
Permit Number - T22CM03375
Permit Status: Complete
Permit Description: SFR F60C22 T22-M0020
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/04/2022 | OTHER | 06/14/2022 | COMPLETED |
10/12/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/13/2023 | APPROVED |
Conditions
Permit Number - T22CM03375
Permit Status: Complete
Permit Description: SFR F60C22 T22-M0020
Date | Description | Comments |
---|---|---|
05/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
05/04/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
05/04/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/13/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/13/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/13/2023 | ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2020-053/P20WP00249 IS ACCEPTED AND RELEASED PCRWRD | |
10/13/2023 | Post-Tension Inspection Report is required. | |
10/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/13/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03375
Permite Description: SFR F60C22 T22-M0020
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/09/2023 | COT - RSEL - Electrical Final | N/A | Re-inspection required | electrical not ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03375
Permit Description: SFR F60C22 T22-M0020
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/28/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 06/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/28/2022 | COT - RSPL - Sewer | Passed | {Activity date: 06/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
06/28/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
07/11/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/11/2022 | COT - RSBU - Preslab | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/11/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/11/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/11/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/11/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/13/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} | |
12/21/2022 | RSME - Mechanical Progress | Passed | ||
12/21/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
12/21/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/21/2022 | COT - RSEL - Construction Power | Passed | ||
12/21/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
12/21/2022 | COT - LCBU - Framing | Passed | ||
02/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
06/09/2023 | FCON – OH Piping & Hydro | Passed | Approved on 1/17/23 on permit TF-FCP-1222-00225 | |
06/09/2023 | COT - FCON - Sprinkler - Final | Passed | Approved on permit #TF-FCP-1222-00225 on 6/8/23 | |
06/09/2023 | RSBU - Building Final | Passed | ||
06/09/2023 | COT - RSME - Mechanical Final | Passed | passed | |
06/09/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
06/09/2023 | COT - FCON - Fire - Final | Passed | ||
06/09/2023 | COT - RSPL - Plumbing Final | Passed | ||
06/28/2023 | COT - RSEL - Electrical Final | Passed |