Permit: T22CM03231
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2835 W KELSO PL
Address NEW:
2835 W KELSO PL
Apply Date:
04/29/2022
Applicant:
Janelle Lavoie
Description:
SFR
Permit Reviews
Permit Number - T22CM03231
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/29/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/02/2022 | COMPLETED |
| 06/10/2022 | RESUBMITTAL | 07/14/2022 | COMPLETED |
| 07/22/2022 | RESUBMITTAL | 08/22/2022 | COMPLETED |
| 08/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | REQUIRES RESUBMIT |
| 03/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/10/2023 | APPROVED |
| 08/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/20/2024 | REQUIRES RESUBMIT |
| 10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | APPROVED |
| 08/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 08/22/2024 | APPROVED |
| 04/10/2023 | RESTAMP - RESIDENTIAL v.1 | 04/11/2023 | APPROVED |
Conditions
Permit Number - T22CM03231
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 08/30/2022 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 08/22/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 09/06/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 08/22/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF PERMIT. | |
| 08/22/2022 | General Contractor Letter (GCL) or Owner/Builder Waiver required prior to permit issuance | |
| 08/22/2024 | SPECIAL INSPECTION FOR CONCRETE Pre-pour Slab Inspection: IS REQUIRED. | |
| 09/06/2024 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
| 09/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03231
Permite Description: SFR
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 06/20/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 06/20/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 06/20/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | |
| 10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
| 06/12/2023 | COT - RSPL - Yard Water Line | N/A | Canceled | 6-12-23: Canceled per contractor. |
| 10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03231
Permit Description: SFR
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2022 | COT - RSEL - Grounding/Bonding | Passed | UFER is installed. | |
| 12/05/2022 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 12/05/2022 | COT - RSBU - Preslab | Passed | canceled concrete for today and had re scheduled for Thursday due to rain and moisture in footings. | |
| 12/05/2022 | COT - RSEL - Electrical Underground | Passed | ||
| 12/05/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/13/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/10/2023 | COT - HCBU - Interior Shear Bracing | Passed | Interior shear walls are complete and properly nailed off. | |
| 03/10/2023 | COT - RSPL - Rough Soil | Passed | Front patio roof is framed and properly nailed off. | |
| 03/10/2023 | COT - RSBU - Roof Nailing | Passed | Roof nailing is complete and properly nailed off. | |
| 03/10/2023 | COT - LCBU - Framing | Passed | Front patio roof is framed and properly nailed off. | |
| 03/17/2023 | BULD - Electrical Clearance | Passed | Approved, ECO Clearance to TEP is required for the construction power | |
| 03/17/2023 | COT - RSEL - Construction Power | Passed | Approved, ECO Clearance to TEP is required for the construction power | |
| 05/24/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/04/2023 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 12/4/2023 | |
| 12/04/2023 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 12/4/2023 | |
| 06/18/2024 | COT - BULD - SWG Clearance | Passed | ||
| 06/18/2024 | COT - FCON - Sprinkler - Final | Passed | Approved by C Basaldua 11/30/2023 | |
| 06/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/07/2024 | COT - RSEL - Electrical Final | Passed | ||
| 08/07/2024 | RSBU - Building Final | Passed | ||
| 08/07/2024 | COT - RSME - Mechanical Final | Passed | ||
| 08/07/2024 | COT - RSPL - Plumbing Final | Passed |