Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM02864
Permit Details
Apply Date:
04/19/2022
Applicant:
Description:
SFR 235.2960 T21-M0055
Permit Reviews
Permit Number - T22CM02864
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/19/2022 | OTHER | 05/17/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM02864
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/19/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
04/19/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/19/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-059/P21WP00060, G-20-089/P21WP00061 AND THE DOWNSTREAM OFFSITE PUBLIC SEWER FORPARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM02864
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/01/2022 | COT - RSPL - Rough Soil | N/A | Canceled | {Activity date: 07/01/2022; Status: Not Applicable; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NA} ; {Activity date: 06/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - } |
11/21/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | see intermediate notes |
10/27/2022 | RSME - Mechanical Progress | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02864
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/29/2022 | COT - RSPL - Sewer | Passed | {Activity date: 06/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/01/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 07/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 06/29/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR} | |
07/08/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/08/2022 | COT - RSBU - Preslab | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/08/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
07/08/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/03/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
08/03/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
11/21/2022 | COT - RSEL - Construction Power | Passed | TEP ECO | |
11/23/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
11/23/2022 | RSME - Mechanical Progress | Passed | ||
11/23/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/23/2022 | COT - RSPL - Gas Pressure Test | Passed | ||
11/23/2022 | COT - LCBU - Framing | Passed | ||
12/22/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
04/07/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
04/10/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
04/10/2023 | COT - RSEL - Electrical Final | Passed | ||
04/11/2023 | COT - RSPL - Plumbing Final | Passed | 4/11/23- water working | |
04/11/2023 | RSBU - Building Final | Passed | Level A/C UNIT U/v tape needed at A/C UNIT cut over flow pipe from water heater 6 inches from ground outside Post tension tag needed at water fixture outside Water not working in showers 4/11/23- work listed above done |
|
04/11/2023 | COT - RSME - Mechanical Final | Passed | Level A/C UNIT U/V tape condenser line at A/C unit 4/11/23- A/C unit leveled and uv tape added |