Permit: T22CM02864

Parcel: 141432860

Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Permit Number - T22CM02864

Inspection Description - RSBU - Building Final 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final  Not Ready
04/10/2023 RSBU - Building Final  Re-inspection required Level A/C UNIT
U/v tape needed at A/C UNIT
cut over flow pipe from water heater 6 inches from ground outside
Post tension tag needed at water fixture outside
Water not working in showers
04/11/2023 RSBU - Building Final  Passed Level A/C UNIT
U/v tape needed at A/C UNIT
cut over flow pipe from water heater 6 inches from ground outside
Post tension tag needed at water fixture outside
Water not working in showers

4/11/23- work listed above done