Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 04/10/2023 | RSBU - Building Final | Re-inspection required | Level A/C UNIT U/v tape needed at A/C UNIT cut over flow pipe from water heater 6 inches from ground outside Post tension tag needed at water fixture outside Water not working in showers |
|
| 04/11/2023 | RSBU - Building Final | Passed | Level A/C UNIT U/v tape needed at A/C UNIT cut over flow pipe from water heater 6 inches from ground outside Post tension tag needed at water fixture outside Water not working in showers 4/11/23- work listed above done |