Permit: T22CM02652
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
511 N TANQUE VERDE LOOP RD 2
Apply Date:
04/12/2022
Applicant:
Carl Cooper
Description:
Second Dwelling
Permit Reviews
Permit Number - T22CM02652
Permit Status: Complete
Permit Description: Second Dwelling
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/12/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 05/17/2022 | COMPLETED |
05/24/2022 | RESUBMITTAL | 06/14/2022 | COMPLETED |
07/15/2022 | RESUBMITTAL | 07/19/2022 | COMPLETED |
10/04/2022 | RESUBMITTAL | 10/05/2022 | COMPLETED |
10/17/2022 | RESUBMITTAL | 10/17/2022 | COMPLETED |
02/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/14/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02652
Permite Description: Second Dwelling
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready | |
10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
10/10/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/9/23: lath not ready for inspection, seal all penetrations. Lath is part of the intermediate inspection, and not a separate inspection. Recall lath when the structure is ready for the intermediate inspection. |
03/08/2024 | RSPL - Plumbing Progress | N/A | Not Applicable | |
03/08/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02652
Permit Description: Second Dwelling
Total Completed Inspections - 18
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/26/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 05/26/2022; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - } | |
05/26/2022 | RSME - Mechanical Progress | Passed | {Activity date: 05/26/2022; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - } | |
03/06/2023 | COT - RSEL - Construction Power | Passed | Approved dual pack, TEP notified of ECO Clearance for unit #2 and INCR Clearance for unit #1 main house (power-kill) | |
05/23/2023 | COT - RSPL - Rough Soil | Passed | ||
09/12/2023 | COT - RSBU - Roof Nailing | Passed | ||
09/27/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | 9/27/23: all corrrections made | |
12/11/2023 | COT - RSPL - Yard Water Line | Passed | ||
12/11/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/13/23: DWV is full of water and under test. Ground screws have been installed in all metal boxes. Bang plates have been added at top and bottom plates where ABS pipes ran through. 4 gang electrical box has been properly supported. All mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation. | |
03/08/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
03/08/2024 | COT - RSBU - Preslab | Passed | ||
03/08/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
03/08/2024 | COT - LCBU - Framing | Passed | ||
05/17/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled and AFCI & GFCI breakers are installed for bedrooms, bathroom, kitchen, outdoor receptacles, and garage. Mini-split units are installed in living room and bedroom with condenser unit outside of building. Okay to issue Certificate of Occupancy for this permit. | |
05/17/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is installed per plan and fully operational. | |
05/17/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled and AFCI & GFCI breakers are installed for bedrooms, bathroom, kitchen, outdoor receptacles, and garage. Mini-split units are installed in living room and bedroom with condenser unit outside of building. Okay to issue Certificate of Occupancy for this permit. | |
05/17/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled and AFCI & GFCI breakers are installed for bedrooms, bathroom, kitchen, outdoor receptacles, and garage. Mini-split units are installed in living room and bedroom with condenser unit outside of building. Okay to issue Certificate of Occupancy for this permit. | |
05/17/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled and AFCI & GFCI breakers are installed for bedrooms, bathroom, kitchen, outdoor receptacles, and garage. Mini-split units are installed in living room and bedroom with condenser unit outside of building. Okay to issue Certificate of Occupancy for this permit. |