Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/12/2022
Applicant:
Carl Cooper
Description:
Second Dwelling

Permit Reviews

Permit Number - T22CM02652
Permit Status: Complete
Permit Description: Second Dwelling
Start Date Submittal Complete Date Status  
04/12/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 05/17/2022 COMPLETED Review Details
05/24/2022 RESUBMITTAL 06/14/2022 COMPLETED Review Details
07/15/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
10/04/2022 RESUBMITTAL 10/05/2022 COMPLETED Review Details
10/17/2022 RESUBMITTAL 10/17/2022 COMPLETED Review Details
02/17/2023 RESIDENTIAL NEW DWELLING v.1 03/14/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02652
Permite Description: Second Dwelling
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/10/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 10/9/23: lath not ready for inspection, seal all penetrations. Lath is part of the intermediate inspection, and not a separate inspection. Recall lath when the structure is ready for the intermediate inspection.
03/08/2024 RSPL - Plumbing Progress N/A Not Applicable
03/08/2024 BULD - Electrical Clearance N/A Not Applicable
10/27/2022 RSBU - Building Final N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02652
Permit Description: Second Dwelling
Total Completed Inspections - 18
Date Description Inspector Results Comments
05/26/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 05/26/2022; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - }
05/26/2022 RSME - Mechanical Progress Passed {Activity date: 05/26/2022; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - }
03/06/2023 COT - RSEL - Construction Power Passed Approved dual pack, TEP notified of ECO Clearance for unit #2 and INCR Clearance for unit #1 main house (power-kill)
05/23/2023 COT - RSPL - Rough Soil Passed
09/12/2023 COT - RSBU - Roof Nailing Passed
09/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed 9/27/23: all corrrections made
12/11/2023 COT - RSPL - Yard Water Line Passed
12/11/2023 COT - RSEL - Electrical Underground Passed
12/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/13/23: DWV is full of water and under test. Ground screws have been installed in all metal boxes. Bang plates have been added at top and bottom plates where ABS pipes ran through. 4 gang electrical box has been properly supported. All mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
03/08/2024 COT - RSEL - Grounding/Bonding Passed
03/08/2024 COT - RSBU - Preslab Passed
03/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/08/2024 COT - LCBU - Framing Passed
05/17/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled and AFCI & GFCI breakers are installed for bedrooms, bathroom, kitchen, outdoor receptacles, and garage. Mini-split units are installed in living room and bedroom with condenser unit outside of building. Okay to issue Certificate of Occupancy for this permit.
05/17/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed per plan and fully operational.
05/17/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled and AFCI & GFCI breakers are installed for bedrooms, bathroom, kitchen, outdoor receptacles, and garage. Mini-split units are installed in living room and bedroom with condenser unit outside of building. Okay to issue Certificate of Occupancy for this permit.
05/17/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled and AFCI & GFCI breakers are installed for bedrooms, bathroom, kitchen, outdoor receptacles, and garage. Mini-split units are installed in living room and bedroom with condenser unit outside of building. Okay to issue Certificate of Occupancy for this permit.
05/17/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled and AFCI & GFCI breakers are installed for bedrooms, bathroom, kitchen, outdoor receptacles, and garage. Mini-split units are installed in living room and bedroom with condenser unit outside of building. Okay to issue Certificate of Occupancy for this permit.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
OWNER BUILDER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANSETREV1_V1.PDF DOCUMENTS VIEW
NARRATIVE REV1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
HVAC CALCULATIONS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPECS 1.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW