Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - T22CM02652
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
10/10/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/9/23: lath not ready for inspection, seal all penetrations. Lath is part of the intermediate inspection, and not a separate inspection. Recall lath when the structure is ready for the intermediate inspection. | |
12/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 12/11/23: vents are empty, ground metal boxes, nail plate ABS at top & bottom plates with large 6x9" plates, support 4 gang elect boxes at both ends | |
12/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/13/23: DWV is full of water and under test. Ground screws have been installed in all metal boxes. Bang plates have been added at top and bottom plates where ABS pipes ran through. 4 gang electrical box has been properly supported. All mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation. |