Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
1361 S EDLIN AV
Address NEW:
1361 S EDLIN AV
Apply Date:
04/12/2022
Applicant:
Edgardo Estrada
Description:
Reconnect Electrical Power

Permit Reviews

Permit Number - T22CM02634
Permit Status: Issued
Permit Description: Reconnect Electrical Power
Start Date Submittal Complete Date Status  
07/06/2022 REVISION - - 1ST 07/13/2022 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02634
Permite Description: Reconnect Electrical Power
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
07/18/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 7/18/24: missing GFCI protected receptacles at laundry room. Cut clean out in back yard to grade. Need hammer arrestor for dishwasher.
07/18/2024 RSBU - Building Final N/A Re-inspection required 7/18/24: missing GFCI protected receptacles at laundry room. Cut clean out in back yard to grade. Need hammer arrestor for dishwasher.
07/18/2024 COT - RSEL - Electrical Final N/A Re-inspection required missing GFCI protected receptacles at laundry room.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02634
Permit Description: Reconnect Electrical Power
Total Completed Inspections - 8
Date Description Inspector Results Comments
09/16/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - CODE TMPP}
09/16/2022 COT - RSEL - Construction Power Passed {Activity date: 09/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Approved. TMMP clearance code for TEP.}
07/18/2024 COT - BULD - SWG Clearance Passed SWG for meter only
07/22/2024 COT - LCPL - Plumbing Intermediate Passed Project complete
07/22/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/22/24 - Project complete.
07/22/2024 COT - RSPL - Plumbing Final Passed 7/22/24 - All corrections complete.
07/22/2024 RSBU - Building Final Passed 7/22/24 - Project complete.
CLOSE PERMIT
07/22/2024 COT - RSEL - Electrical Final Passed Project complete

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_ PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REV1 APPLICATION.PDF DOCUMENTS VIEW
REV1 JOB CARD.PDF DOCUMENTS VIEW
REV1 PERMIT.PDF DOCUMENTS VIEW
REV1_ PLANS.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW