Permit: T22CM02469
Permit Details
Apply Date:
04/04/2022
Applicant:
burak bekat
Description:
SFR BRIO1432 T20-M0058
Permit Reviews
Permit Number - T22CM02469
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/04/2022 | OTHER | 04/08/2022 | COMPLETED |
12/06/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/08/2023 | APPROVED |
Conditions
Permit Number - T22CM02469
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date | Description | Comments |
---|---|---|
04/04/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
04/08/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
04/08/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
12/08/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/21/2024 | Post-Tension Inspection Report is required. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02469
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
09/12/2023 | COT - FCON - Fire - Final | N/A | Not Applicable | |
09/12/2023 | COT - RSBU - Sustainability | N/A | Not Applicable | |
08/30/2023 | ENGR Engineering Final | N/A | Partial Pass | level one TC OF O. For stocking and plants splash pads, riprap need to be completed. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02469
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/18/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/18/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
06/20/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
06/20/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
06/20/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
07/18/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 07/18/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/18/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - A. Ok to cover progress areas.} | |
11/28/2022 | RSME - Mechanical Progress | Passed | ||
11/28/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
11/28/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/28/2022 | COT - LCBU - Framing | Passed | ||
12/27/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/08/2023 | BULD - Electrical Clearance | Passed | ||
09/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
09/12/2023 | COT - RSPL - Plumbing Final | Passed | ||
09/12/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/12/2023 | COT - RSPL - Sewer | Passed | ||
09/12/2023 | COT - RSEL - Construction Power | Passed | ||
09/14/2023 | COT - RSME - Mechanical Final | Passed | 9/12/23:AC unit breaker requires 45-50Amp, AC unit disconnect fuses min 45Amp, Secure and seal all roof jacks. 9/14/23: Level 4 TCO |
|
09/14/2023 | RSBU - Building Final | Passed | 9/12/23:AC unit breaker requires 45-50Amp, AC unit disconnect fuses min 45Amp, Secure and seal all roof jacks. 9/14/23: Level 4 TCO |
|
09/14/2023 | COT - RSEL - Electrical Final | Passed | 9/12/23:AC unit breaker requires 45-50Amp, AC unit disconnect fuses min 45Amp, Secure and seal all roof jacks. 9/14/23: Level 4 TCO |
|
11/27/2023 | ENGR Engineering Final | Passed |