Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/04/2022
Applicant:
ramon polanco
Description:
SFR BRIOS1432 T20-M0059

Permit Reviews

Permit Number - T22CM02468
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date Submittal Complete Date Status  
04/04/2022 OTHER 04/08/2022 COMPLETED Review Details
12/06/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/08/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02468
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date Description Comments
04/04/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/08/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
04/08/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.
12/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/21/2024 Post-Tension Inspection Report is required.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02468
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/12/2023 COT - RSBU - Sustainability N/A Not Applicable
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
08/30/2023 ENGR Engineering Final N/A Partial Pass Roof drain splash pads and back ordered plants need to be completed prior to next inspection TC of O #1

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02468
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/18/2022 COT - RSPL - Rough Soil Passed {Activity date: 05/18/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
05/26/2022 COT - RSEL - Electrical Underground Passed {Activity date: 05/26/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved}
06/20/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
06/20/2022 COT - RSBU - Preslab Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
06/20/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved 2 story}
07/14/2022 COT - RSBU - Roof Nailing Passed {Activity date: 07/14/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
10/18/2022 COT - RSPL - Yard Water Line Passed {Activity date: 10/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover progress areas.}
11/21/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/21/2022 COT - LCPL - Plumbing Intermediate Passed
11/21/2022 COT - LCBU - Framing Passed
11/22/2022 RSME - Mechanical Progress Passed
12/23/2022 COT - RSBU - Exterior Clips/Sheathing Passed
12/23/2022 COT - HCBU - Interior Shear Bracing Passed
08/02/2023 BULD - Electrical Clearance Passed
09/12/2023 COT - RSPL - Sewer Passed
09/12/2023 COT - RSEL - Construction Power Passed
09/12/2023 COT - RSPL - Plumbing Final Passed
09/14/2023 COT - RSME - Mechanical Final Passed 9/14/23: Level 4 TCO
09/14/2023 RSBU - Building Final Passed 9/14/23: Level 4 TCO
09/14/2023 COT - RSEL - Electrical Final Passed 9/14/23: Level 4 TCO
11/27/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
UTILITY PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
133007-1-2023-12-01_V1.PDF DOCUMENTS VIEW
CONS-BRIOSO_AT_THE_BRIDGES_MODEL_SFR_3BR_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
UTILITY PLAN.PDF DOCUMENTS VIEW