Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
03/30/2022
Applicant:
ramon polanco
Description:
SFR BRIO1432 T20-M0058

Permit Reviews

Permit Number - T22CM02314
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date Submittal Complete Date Status  
03/30/2022 OTHER 04/04/2022 COMPLETED Review Details
12/05/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/08/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02314
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date Description Comments
03/30/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/05/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/05/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
04/05/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/05/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
04/05/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/05/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02314
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
08/29/2023 COT - RSEL - Construction Power N/A Not Applicable
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
08/30/2023 ENGR Engineering Final N/A Partial Pass Roof drain splash pads and back ordered plants need to be completed prior to next inspection okay for TCO level 4
09/06/2023 COT - RSEL - Electrical Final N/A Re-inspection required (with fee)
09/06/2023 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02314
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/07/2022 COT - RSPL - Rough Soil Passed {Activity date: 04/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/19/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/19/2022 COT - RSBU - Preslab Passed {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/19/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
06/13/2022 COT - RSBU - Roof Nailing Passed {Activity date: 06/13/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
10/17/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 10/17/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
10/17/2022 COT - RSBU - Sustainability Passed {Activity date: 10/17/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
10/18/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 10/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to insulate and cover walls.} ; {Activity date: 10/17/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Pex line needs to be 12” minimum away from light fixture. Shower pan should be filled 1” minimum. Drain line for water heater is out of wall. Attach strap to vent line.}
12/12/2022 COT - HCBU - Interior Shear Bracing Passed
07/12/2023 BULD - Electrical Clearance Passed
08/29/2023 COT - RSME - Mechanical Final Passed
08/29/2023 COT - LCPL - Plumbing Intermediate Passed
08/29/2023 RSME - Mechanical Progress Passed
08/29/2023 COT - RSPL - Yard Water Line Passed
08/29/2023 COT - RSEL - Electrical Underground Passed
08/29/2023 COT - RSPL - Sewer Passed
08/29/2023 COT - LCBU - Framing Passed
08/29/2023 COT - RSPL - Plumbing Final Passed
08/29/2023 RSEL - Electrical Progress Passed
11/27/2023 ENGR Engineering Final Passed
01/24/2024 COT - RSEL - Electrical Final Passed
01/29/2024 RSBU - Building Final Passed ok for TCO 4

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPECIAL INSPECTION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
UTILITY PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
132158-1-2023-12-01_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SPECIAL INSPECTION.PDF DOCUMENTS VIEW
UTILITY PLAN.PDF DOCUMENTS VIEW