Permit: T22CM02314
Permit Details
Apply Date:
03/30/2022
Applicant:
ramon polanco
Description:
SFR BRIO1432 T20-M0058
Permit Reviews
Permit Number - T22CM02314
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/30/2022 | OTHER | 04/04/2022 | COMPLETED |
12/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/08/2023 | APPROVED |
Conditions
Permit Number - T22CM02314
Permit Status: Complete
Permit Description: SFR BRIO1432 T20-M0058
Date | Description | Comments |
---|---|---|
03/30/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
04/05/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
04/05/2022 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
04/05/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/05/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
04/05/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/05/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM02314
Permite Description: SFR BRIO1432 T20-M0058
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/29/2023 | COT - RSEL - Construction Power | N/A | Not Applicable | |
10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
08/30/2023 | ENGR Engineering Final | N/A | Partial Pass | Roof drain splash pads and back ordered plants need to be completed prior to next inspection okay for TCO level 4 |
09/06/2023 | COT - RSEL - Electrical Final | N/A | Re-inspection required (with fee) | |
09/06/2023 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM02314
Permit Description: SFR BRIO1432 T20-M0058
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 04/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
05/19/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
05/19/2022 | COT - RSBU - Preslab | Passed | {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
05/19/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/19/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} | |
06/13/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/13/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
10/17/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/17/2022 | COT - RSBU - Sustainability | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} | |
10/18/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to insulate and cover walls.} ; {Activity date: 10/17/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Pex line needs to be 12” minimum away from light fixture. Shower pan should be filled 1” minimum. Drain line for water heater is out of wall. Attach strap to vent line.} | |
12/12/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/12/2023 | BULD - Electrical Clearance | Passed | ||
08/29/2023 | COT - RSME - Mechanical Final | Passed | ||
08/29/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
08/29/2023 | RSME - Mechanical Progress | Passed | ||
08/29/2023 | COT - RSPL - Yard Water Line | Passed | ||
08/29/2023 | COT - RSEL - Electrical Underground | Passed | ||
08/29/2023 | COT - RSPL - Sewer | Passed | ||
08/29/2023 | COT - LCBU - Framing | Passed | ||
08/29/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/29/2023 | RSEL - Electrical Progress | Passed | ||
11/27/2023 | ENGR Engineering Final | Passed | ||
01/24/2024 | COT - RSEL - Electrical Final | Passed | ||
01/29/2024 | RSBU - Building Final | Passed | ok for TCO 4 |