Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
Permit Number - T22CM02314
Inspection Description - RSBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | RSBU - Building Final | Not Ready | ||
01/24/2024 | RSBU - Building Final | Partial Pass | 8/29/23: electrical panel cover needs to be replaced/repaired, panel schedule needs to be verified 9/8/23 needs uninstructed clamp on riser, ok for level 4 TCO 1/24/24: level 4 TCO |
|
01/29/2024 | RSBU - Building Final | Passed | ok for TCO 4 | |
08/29/2023 | RSBU - Building Final | Re-inspection required | 8/29/23: electrical panel cover needs to be replaced/repaired, panel schedule needs to be verified | |
08/30/2023 | RSBU - Building Final | Not Ready | ||
08/31/2023 | RSBU - Building Final | Not Ready | ||
09/01/2023 | RSBU - Building Final | Partial Pass | 8/29/23: electrical panel cover needs to be replaced/repaired, panel schedule needs to be verified ok for level 3 TCO | |
09/05/2023 | RSBU - Building Final | Not Ready | ||
09/06/2023 | RSBU - Building Final | Not Ready | ||
09/08/2023 | RSBU - Building Final | Partial Pass | 9/8/23 needs uninstructed clamp on riser, ok for level 4 TCO | |
11/28/2023 | RSBU - Building Final | Not Ready | ||
12/01/2023 | RSBU - Building Final | Not Ready |