Permit: T22CM02018
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
2341 E 7TH ST
Address NEW:
2341 E 7TH ST
Apply Date:
03/18/2022
Applicant:
Gary Weiss
Description:
SFR
Permit Reviews
Permit Number - T22CM02018
Permit Status: Issued
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 04/12/2022 | COMPLETED |
| 04/14/2022 | RESUBMITTAL | 04/25/2022 | COMPLETED |
| 08/07/2022 | RESUBMITTAL | 08/25/2022 | COMPLETED |
| 09/06/2022 | RESUBMITTAL | 09/09/2022 | COMPLETED |
| 09/15/2022 | RESUBMITTAL | 09/20/2022 | COMPLETED |
| 02/01/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/28/2023 | APPROVED |
Conditions
Permit Number - T22CM02018
Permit Status: Issued
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 09/08/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 11/08/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 10/26/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM02018
Permite Description: SFR
Total Outstanding Inspections - 18
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 09/20/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 09/20/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 09/20/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 04/20/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Approved. Okay for concrete placement in footings and slab. 4/20/2023 pending garage. |
| 10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
| 04/20/2023 | COT - RSBU - Preslab | N/A | Partial Pass | Approved. Okay for concrete placement in footings and slab. 4/20/2023 pending garage. |
| 11/07/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 11/7/23: no reply from contractor, no plans on site roof has been dried in before inspection |
| 11/07/2023 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 11/7/23: gas pressure gauge is not under 15 pounds of pressure |
| 11/07/2023 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 11/7/23: no reply from contractor, no plans on site roof has been dried in before inspection |
| 11/07/2023 | COT - LCBU - Framing | N/A | Re-inspection required | 11/7/23: no reply from contractor, no plans on site roof has been dried in before inspection |
| 11/07/2023 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
| 10/15/2025 | COT - RSME - Mechanical Final | N/A | Canceled | No response from applicant. Canceled |
| 10/15/2025 | COT - RSEL - Outdoor Lighting | N/A | Canceled | No response from applicant. Canceled |
| 10/15/2025 | COT - RSPL - Sewer | N/A | Canceled | No response from applicant. Canceled |
| 10/15/2025 | COT - RSPL - Yard Water Line | N/A | Canceled | No response from applicant. Canceled |
| 10/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled | No response from applicant. Canceled |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM02018
Permit Description: SFR
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under water test. Okay to backfill and prepare for concrete slab. | |
| 04/21/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/03/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved. Okay for concrete placement in garage. 5/3/2023 | |
| 07/13/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/13/2023 | COT - RSBU - Preslab | Passed | ||
| 07/13/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 08/30/2023 | BULD - Electrical Clearance | Passed | Approved new service, ECO Clearance to TEP is required | |
| 02/08/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2/6/24: passed by previous inspector | |
| 02/08/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/08/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 02/08/2024 | COT - LCBU - Framing | Passed | ||
| 06/18/2024 | COT - HCBU - Interior Shear Bracing | Passed |