Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
2341 E 7TH ST
Apply Date:
03/18/2022
Applicant:
Karen Bellamy
Description:
SFR

Permit Reviews

Permit Number - T22CM02018
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
03/18/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 04/12/2022 COMPLETED Review Details
04/14/2022 RESUBMITTAL 04/25/2022 COMPLETED Review Details
08/07/2022 RESUBMITTAL 08/25/2022 COMPLETED Review Details
09/06/2022 RESUBMITTAL 09/09/2022 COMPLETED Review Details
09/15/2022 RESUBMITTAL 09/20/2022 COMPLETED Review Details
02/01/2023 RESIDENTIAL NEW DWELLING v.1 02/28/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02018
Permit Status: Issued
Permit Description: SFR
Date Description Comments
09/08/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
11/08/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
10/26/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM02018
Permite Description: SFR
Total Outstanding Inspections - 17
Last Inspection Date Description Inspector Results Comments
09/20/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 09/20/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
09/20/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 09/20/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 RSBU - Building Final N/A Not Ready
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
04/20/2023 COT - RSBU - Excavation/Rebar/Zoning N/A Partial Pass Approved. Okay for concrete placement in footings and slab. 4/20/2023 pending garage.
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
04/20/2023 COT - RSBU - Preslab N/A Partial Pass Approved. Okay for concrete placement in footings and slab. 4/20/2023 pending garage.
11/07/2023 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 11/7/23: no reply from contractor, no plans on site
roof has been dried in before inspection
11/07/2023 COT - RSPL - Gas Pressure Test N/A Re-inspection required 11/7/23: gas pressure gauge is not under 15 pounds of pressure
11/07/2023 COT - RSBU - Roof Nailing N/A Re-inspection required 11/7/23: no reply from contractor, no plans on site
roof has been dried in before inspection
11/07/2023 COT - LCBU - Framing N/A Re-inspection required 11/7/23: no reply from contractor, no plans on site
roof has been dried in before inspection
11/07/2023 COT - HCBU - Interior Shear Bracing N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM02018
Permit Description: SFR
Total Completed Inspections - 13
Date Description Inspector Results Comments
03/29/2023 COT - RSPL - Rough Soil Passed Underground plumbing is complete and under water test. Okay to backfill and prepare for concrete slab.
04/21/2023 COT - RSEL - Grounding/Bonding Passed
05/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Approved. Okay for concrete placement in garage. 5/3/2023
07/13/2023 COT - RSBU - Interior Shear Bracing Passed
07/13/2023 COT - RSBU - Preslab Passed
07/13/2023 COT - RSEL - Electrical Underground Passed
08/30/2023 BULD - Electrical Clearance Passed Approved new service, ECO Clearance to TEP is required
02/08/2024 COT - RSBU - Exterior Clips/Sheathing Passed 2/6/24: passed by previous inspector
02/08/2024 COT - RSPL - Gas Pressure Test Passed
02/08/2024 COT - RSBU - Roof Nailing Passed
02/08/2024 COT - LCBU - Framing Passed
06/18/2024 COT - HCBU - Interior Shear Bracing Passed
06/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed

Documents

File Name Document Type  
CHANGE_V1.PDF DOCUMENTS VIEW
CONS-2341 E. 7TH ST._V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
HVAC SPECS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW