Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
03/17/2022
Applicant:
Alex Silverman
Description:
SFR

Permit Reviews

Permit Number - T22CM01952
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
03/17/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 04/18/2022 COMPLETED Review Details
04/22/2022 RESUBMITTAL 05/17/2022 COMPLETED Review Details
05/23/2022 RESUBMITTAL 05/26/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM01952
Permit Status: Issued
Permit Description: SFR
Date Description Comments
05/26/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
03/17/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM01952
Permite Description: SFR
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
04/28/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 04/28/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - RSPL - Gas Pressure Test N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
05/25/2023 RSBU - Building Final N/A Re-inspection required (with fee) 5/25/23: Paint all exterior PVC, Label all breakers area specific & arc-fault approximately 10 existing breakers, install a door lock at the exterior mechanical room, maintain min 1" clearance around B-vent to combustibles.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM01952
Permit Description: SFR
Total Completed Inspections - 20
Date Description Inspector Results Comments
06/02/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
06/16/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/14/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled no message and locked gate

}
06/16/2022 COT - RSBU - Preslab Passed {Activity date: 06/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/14/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled no message and locked gate

}
06/16/2022 COT - RSEL - Electrical Underground Passed {Activity date: 06/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/14/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled no message and locked gate

}
06/16/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/14/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled no message and locked gate

}
08/16/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 08/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved}
08/25/2022 COT - RSBU - Roof Nailing Passed {Activity date: 08/25/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/16/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Denied:1-Staple all joints/hips at 4" o.c. Max. 2-Block joints of sheeting turned perpendicular to supports.}
10/14/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 10/14/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
10/14/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/14/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/13/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 04/28/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
11/14/2022 COT - LCBU - Framing Passed
11/15/2022 COT - HCBU - Interior Shear Bracing Passed
01/03/2023 COT - RSEL - Construction Power Passed ECO clearance code.
01/11/2023 COT - RSPL - Sewer Passed
01/11/2023 COT - RSPL - Yard Water Line Passed
03/28/2023 COT - RSEL - Outdoor Lighting Passed
03/28/2023 COT - RSEL - Electrical Final Passed
03/28/2023 COT - RSPL - Plumbing Final Passed
04/12/2023 COT - RSME - Mechanical Final Passed
11/21/2023 FCON – OH Piping & Hydro Passed
07/06/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HVAC LOAD CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
HVAC LOAD CALCS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW