Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Permit Number - T22CM01952

Inspection Description - RSBU - Building Final 

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 RSBU - Building Final  Not Ready
03/28/2023 RSBU - Building Final  Re-inspection required 3-28-23: Install landing at garage man door.
04/12/2023 RSBU - Building Final  Re-inspection required
04/17/2023 RSBU - Building Final  Re-inspection required 3-28-23: Install landing at garage man door.

4-12-23: Landing at garage man door is not per Code.

4/17/23: Paint all exterior PVC, Label all breakers area specific & arc-fault approximately 10 existing breakers, hard landing min 36" deep the width of the opening. (Loose pavers or masonry caps are not compliant), install a door lock at the exterior mechanical room, maintain min 1" clearance around B-vent to combustibles.
05/25/2023 RSBU - Building Final  Re-inspection required (with fee) 5/25/23: Paint all exterior PVC, Label all breakers area specific & arc-fault approximately 10 existing breakers, install a door lock at the exterior mechanical room, maintain min 1" clearance around B-vent to combustibles.
05/31/2023 RSBU - Building Final  Not Ready
06/02/2023 RSBU - Building Final  Re-inspection required
06/22/2023 RSBU - Building Final  Re-inspection required (with fee) 3-28-23: Install landing at garage man door.

4-12-23: Landing at garage man door is not per Code.

4/17/23: Paint all exterior PVC, Label all breakers area specific & arc-fault approximately 10 existing breakers, hard landing min 36" deep the width of the opening. (Loose pavers or masonry caps are not compliant), install a door lock at the exterior mechanical room, maintain min 1" clearance around B-vent to combustibles.

5/25/23: Paint all exterior PVC, Label all breakers area specific & arc-fault approximately 10 existing breakers, install a door lock at the exterior mechanical room, maintain min 1" clearance around B-vent to combustibles.
5/31/23: not ready
6/2/23: install a door lock at the exterior mechanical room, maintain min 1" clearance around B-vent to combustibles
6/22/23: maintain min 1" clearance around B-vent to combustibles
06/30/2023 RSBU - Building Final  Re-inspection required 6-30-23: Landing is not 3' deep per R311.3.
07/06/2023 RSBU - Building Final  Passed