Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/16/2022
Applicant:
Troy White
Description:
Interior renovation with small addition.

Permit Reviews

Permit Number - T22CM01923
Permit Status: Complete
Permit Description: Interior renovation with small addition.
Start Date Submittal Complete Date Status  
03/16/2022 3RD PARTY REVIEW - COMMERCIAL TI 05/18/2022 COMPLETED Review Details
08/11/2022 3RD PARTY REVIEW - COMMERCIAL 09/08/2022 COMPLETED Review Details
10/01/2022 RESUBMITTAL 10/20/2022 COMPLETED Review Details
06/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/29/2023 REQUIRES RESUBMIT Review Details
06/30/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.3 06/30/2023 APPROVED Review Details
07/24/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/25/2023 APPROVED Review Details
06/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/26/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM01923
Permit Status: Complete
Permit Description: Interior renovation with small addition.
Date Description Comments
05/18/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01923
Permite Description: Interior renovation with small addition.
Total Outstanding Inspections - 15
Last Inspection Date Description Inspector Results Comments
02/27/2023 COT - HCBU - Interior Shear Bracing N/A Not Applicable There are no interior shear walls on this project.
01/18/2023 COT - LCBU - Framing N/A Partial Pass rough framing is 75% complete on walls & ceiling.
12/21/2022 COT - LCBU - Building Progress N/A Partial Pass
05/19/2023 COT - LCEL - Electrical Intermediate N/A Partial Pass
06/21/2023 COT - LCBU - Sustainability N/A Not Applicable Not required. Project is not LEED Certified.
04/05/2023 COT - LCEL - Electrical Above Ceiling N/A Partial Pass partial approval for break room and office in SW corner only mechanical and plumbing passed
02/01/2023 COT - LCPL - Plumbing Above Ceiling N/A Partial Pass Receiving room #113, Hall -2, Starch room #116, Break room #118, Restroom #121 and 122, Janitors room #123, Office Admin #100, South end of Work room #115 okay to proceed.
02/01/2023 COT - LCME - Mechanical Progress N/A Partial Pass work room #115 okay to proceed.
02/01/2023 COT - LCPL - Plumbing Progress N/A Partial Pass Receiving room #113, Hall -2, Starch room #116, Break room #118, Restroom #121 and 122, Janitors room #123, Office Admin #100, South end of Work room #115 above ceiling and intermediate.
02/01/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass Receiving room #113, Hall -2, Starch room #116, Break room #118, Restroom #121 and 122, Janitors room #123, Office Admin #100, South end of Work room #115 okay for 1 side drywall.
06/23/2023 COT - LCEL - Electrical Final N/A Re-inspection required 6/23/23: outlets within 6 feet of sink required to be GFCI,
07/19/2023 BULD - Electrical Clearance N/A Not Applicable
06/23/2023 COT - LCME - Mechanical Final N/A Re-inspection required 6/23/23: install a OSHA approved ladder extendable handle at top of roof ladder. More items may be added after access to the roof.
07/19/2023 COT - LCPL - Plumbing Final N/A Partial Pass 1 in air gap required on mop sink and floor grates
06/23/2023 COT - LCBU - Building Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01923
Permit Description: Interior renovation with small addition.
Total Completed Inspections - 30
Date Description Inspector Results Comments
12/12/2022 COT - LCPL - Rough Soil Passed building all under pressure. okay to back fill. shading required.
12/15/2022 COT - LCEL - Electrical Underground Passed Electric service to be run across roof of structure…no electric underground.
12/19/2022 COT - LCBU - Excavation/Rebar/Zoning Passed
12/19/2022 COT - LCBU - Preslab Passed okay for concrete.
12/21/2022 COT - HCPL - Rough Soil Passed grease trap interceptor connected and under pressure. shading required
12/21/2022 COT - HCPL - Sewer Passed okay to backfill. shading required
02/27/2023 COT - LCBU - Framing Passed Framing is complete. Okay to sheet rock both sides of walls.
02/27/2023 COT - HCPL - Yard Water Line Passed Water supply for building is connected to the back-flow preventer at the street. Water has been turned on to pressurize the system with no leaks. Okay to backfill trenches.
04/28/2023 COT - LCEL - Construction Power Passed Electrical conduit from new transformer pad to building is installed in trench. Okay to backfill trench and install ribbon tape one foot below grade.
05/05/2023 COT - LCEL - Grounding/Bonding Passed Grounding rods are in place with copper wire from panel boxes to rods connected. Okay to backfill trenches and compact.
05/05/2023 COT - LCBU - Building Progress Passed FRP is installed on walls. Grid ceiling is installed in office areas and prep areas. Walk-ins are installed. Electricians are pulling wires from panel to outlets.
05/19/2023 COT - LCEL - Electrical Progress Passed
06/21/2023 COT - BULD - SWG Clearance Passed Gas line is under pressure and holding 15# of air. Okay to connect gas to building.
06/21/2023 COT - LCPL - Gas Pressure Test Passed Gas line is under pressure and holding 15# of air. Okay to connect gas to building.
06/21/2023 COT - LCEL - Electrical Above Ceiling Passed Electrical above ceiling is complete. Okay to install ceiling tiles in grid ceiling.
06/21/2023 COT - LCPL - Plumbing Above Ceiling Passed 6-21-23: Plumbing above ceiling is complete. Okay to install ceiling tiles in grid ceiling.
06/21/2023 COT - LCBU - Building Above Ceiling Passed Mechanical, plumbing, & electrical above ceiling is complete. Okay to install ceiling tile in grid ceiling.
06/21/2023 COT - LCME - Mechanical Above Ceiling Passed Mechanical above ceiling is complete. Okay to install ceiling tile in grid ceiling.
06/21/2023 COT - LCME - Mechanical Intermediate Passed Mechanical is complete and operational.
06/21/2023 COT - LCME - Mechanical Progress Passed Mechanical is complete and operational.
06/21/2023 COT - LCEL - Outdoor Lighting Passed Exterior lights are flush mounted to exterior walls and point directly to the ground. 3 lights on the front and rear of building and 4 lights on each side of building.
06/21/2023 COT - LCPL - Plumbing Progress Passed Plumbing is complete and operational.
06/21/2023 COT - LCPL - Plumbing Intermediate Passed Plumbing is complete and operational.
06/21/2023 COT - LCME - Kitchen Hood Passed Kitchen hood is installed and functional. Smoke test was preformed by the annul system installer.
06/23/2023 SITE - Zoning Final Passed
06/29/2023 COT - LCEL - Electrical Final Passed
07/19/2023 COT - FCON - Fire - Final Passed
07/21/2023 COT - LCME - Mechanical Final Passed
07/21/2023 COT - LCPL - Plumbing Final Passed
07/24/2023 COT - LCBU - Building Final Passed see previous results

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
HALO MANUFACTURING - FINAL REPORT_V2.PDF DOCUMENTS VIEW
REPORT AND LAB ANALYSIS-2023-06-30_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPPLICATION.PDF DOCUMENTS VIEW
LOAD CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
PSA_STANTEC.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW