Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Brent Stevens
Description:
210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7

Permit Reviews

Permit Number - T22CM01455
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/02/2022 COMPLETED Review Details
06/30/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
08/12/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/06/2022 COMPLETED Review Details
06/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/06/2024 APPROVED Review Details
06/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/21/2024 APPROVED Review Details
06/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/18/2024 APPROVED Review Details

Conditions

Permit Number - T22CM01455
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7
Date Description Comments
10/06/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
10/06/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 SHOP DRAWINGS REQUIRED FOR WOOD FLOOR JOISTS.
10/06/2022 SHOP DRAWINGS REQUIRED FOR TRUSSES, WOOD ROOF TRUSSES.
10/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
06/12/2024 PCRWRD requests that the City of Tucson, add the PCRWRD Condition to the COT building permit #T22CM01449:ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATION IS ISSUED BY PDEQ FOR THE PRIVATE SEWER #P22SD00039 Gerry KoziolPima County DSD-Building Codes/Wastewater Utility Fee201 N Stone Ave Tucson, AZ 85701(520)724-6503
06/18/2024 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01455
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7
Total Outstanding Inspections - 17
Last Inspection Date Description Inspector Results Comments
10/09/2023 COT - LCME - Mechanical Above Ceiling N/A Partial Pass South breezeway.
10/09/2023 COT - HCBU - Interior Shear Bracing N/A Partial Pass Above ceiling firewalls.
10/09/2023 COT - LCPL - Plumbing Roof Drains N/A Partial Pass South breezeway.
10/09/2023 COT - LCBU - Framing N/A Partial Pass South breezeway.
10/09/2023 COT - LCEL - Electrical Above Ceiling N/A Partial Pass South breezeway.
10/09/2023 COT - LCPL - Plumbing Above Ceiling N/A Partial Pass South breezeway.
12/07/2023 COT - LCPL - Plumbing Intermediate N/A Not Ready
12/07/2023 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
12/07/2023 COT - LCEL - Electrical Intermediate N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
06/24/2024 COT - LCME - Mechanical Final N/A Partial Pass 6/24/24: south half of building 7 partial pass.
07/15/2024 COT - LCPL - Plumbing Final N/A Partial Pass 6/24/24: south half of building 7 partial pass.
7/15/24: north half passed. Pending fire inspection
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
06/24/2024 COT - LCBU - Building Final N/A Partial Pass 6/24/24: south half of building 7 partial pass.
06/24/2024 COT - LCEL - Electrical Final N/A Partial Pass 6/24/24: south half of building 7 partial pass.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01455
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7
Total Completed Inspections - 31
Date Description Inspector Results Comments
01/24/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
01/31/2023 COT - LCPL - Rough Soil Passed
06/16/2023 COT - LCEL - Electrical Underground Passed
06/16/2023 COT - LCBU - Preslab Passed
06/28/2023 COT - LCBU - Roof Nailing Passed
07/17/2023 COT - LCBU - Exterior Clips/Sheathing Passed remainder of third floor
10/09/2023 COT - LCPL - Sewer Passed
10/09/2023 COT - LCPL - Backwater Valve Passed
10/20/2023 COT - LCME - Mechanical Above Ceiling Passed 10/20/23:Middle Breezeway 6 South units.
11/15/2023 COT - HCBU - Interior Shear Bracing Passed
11/17/2023 COT - LCPL - Plumbing Roof Drains Passed
11/17/2023 COT - LCBU - Framing Passed
11/17/2023 COT - LCEL - Electrical Above Ceiling Passed
11/17/2023 COT - LCPL - Plumbing Above Ceiling Passed
12/08/2023 COT - LCME - Mechanical Intermediate Passed
12/08/2023 COT - LCPL - Plumbing Intermediate Passed
12/08/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
12/08/2023 COT - LCEL - Electrical Intermediate Passed
12/11/2023 COT - LCME - Mechanical Progress Passed
12/11/2023 COT - LCEL - Electrical Progress Passed
12/11/2023 COT - LCBU - Building Above Ceiling Passed
12/11/2023 COT - LCBU - Building Progress Passed
12/11/2023 COT - LCPL - Plumbing Progress Passed
04/29/2024 COT - LCEL - Service Upgrade Passed 4/19/24: South Electrical Gear / Meter bank ECO CLEARANCE for (HPG1,GARG1,7101,7201,7301,7102,7203,7103,7302,7202,7303,7104,7204,7304,7105,7205,7305,7306,7206,7106)

4/29/24: North Electrical Gear / Meter Bank ECO CLEARANCE for (HPG2,7107,7108,7109,7110,7111,7112,7113,7114,7207,7208,7209,7210,7211,7212,7213,7214,7307,7308,7309,7310,7311,7312,7313,7314)
06/11/2024 COT - FCON - Alarm - Final Passed
06/24/2024 COT - LCBU - Sustainability Passed
07/09/2024 ENGR Engineering Final Passed
07/15/2024 COT - LCEL - Outdoor Lighting Passed
07/16/2024 COT - FCON - Sprinkler - Final Passed
07/16/2024 COT - LCBU - Building Final Passed
07/16/2024 COT - LCEL - Electrical Final Passed