Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2024 | ENGR Engineering Final | Partial Pass | Water flow from parking lot and building have washed out the drainage areas in several spots impacting basin, this was after one storm. 1) left side of building at lot drain to basin. 2) Both left side roof drains 3) All rear roof drains. |
|
| 07/09/2024 | ENGR Engineering Final | Passed |