Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Brent Stevens
Description:
210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7

Permit Reviews

Permit Number - T22CM01455
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/02/2022 COMPLETED Review Details
06/30/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
08/12/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/06/2022 COMPLETED Review Details
06/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/06/2024 APPROVED Review Details
06/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/21/2024 APPROVED Review Details
06/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/18/2024 APPROVED Review Details

Conditions

Permit Number - T22CM01455
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7
Date Description Comments
10/06/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
10/06/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 SHOP DRAWINGS REQUIRED FOR WOOD FLOOR JOISTS.
10/06/2022 SHOP DRAWINGS REQUIRED FOR TRUSSES, WOOD ROOF TRUSSES.
10/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
06/12/2024 PCRWRD requests that the City of Tucson, add the PCRWRD Condition to the COT building permit #T22CM01449:ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATION IS ISSUED BY PDEQ FOR THE PRIVATE SEWER #P22SD00039 Gerry KoziolPima County DSD-Building Codes/Wastewater Utility Fee201 N Stone Ave Tucson, AZ 85701(520)724-6503
06/18/2024 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01455
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7
Total Outstanding Inspections - 17
Last Inspection Date Description Inspector Results Comments
10/09/2023 COT - LCME - Mechanical Above Ceiling N/A Partial Pass South breezeway.
10/09/2023 COT - HCBU - Interior Shear Bracing N/A Partial Pass Above ceiling firewalls.
10/09/2023 COT - LCPL - Plumbing Roof Drains N/A Partial Pass South breezeway.
10/09/2023 COT - LCBU - Framing N/A Partial Pass South breezeway.
10/09/2023 COT - LCEL - Electrical Above Ceiling N/A Partial Pass South breezeway.
10/09/2023 COT - LCPL - Plumbing Above Ceiling N/A Partial Pass South breezeway.
12/07/2023 COT - LCPL - Plumbing Intermediate N/A Not Ready
12/07/2023 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
12/07/2023 COT - LCEL - Electrical Intermediate N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
06/24/2024 COT - LCME - Mechanical Final N/A Partial Pass 6/24/24: south half of building 7 partial pass.
07/15/2024 COT - LCPL - Plumbing Final N/A Partial Pass 6/24/24: south half of building 7 partial pass.
7/15/24: north half passed. Pending fire inspection
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
06/24/2024 COT - LCBU - Building Final N/A Partial Pass 6/24/24: south half of building 7 partial pass.
06/24/2024 COT - LCEL - Electrical Final N/A Partial Pass 6/24/24: south half of building 7 partial pass.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01455
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 7
Total Completed Inspections - 31
Date Description Inspector Results Comments
01/24/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
01/31/2023 COT - LCPL - Rough Soil Passed
06/16/2023 COT - LCEL - Electrical Underground Passed
06/16/2023 COT - LCBU - Preslab Passed
06/28/2023 COT - LCBU - Roof Nailing Passed
07/17/2023 COT - LCBU - Exterior Clips/Sheathing Passed remainder of third floor
10/09/2023 COT - LCPL - Sewer Passed
10/09/2023 COT - LCPL - Backwater Valve Passed
10/20/2023 COT - LCME - Mechanical Above Ceiling Passed 10/20/23:Middle Breezeway 6 South units.
11/15/2023 COT - HCBU - Interior Shear Bracing Passed
11/17/2023 COT - LCPL - Plumbing Roof Drains Passed
11/17/2023 COT - LCBU - Framing Passed
11/17/2023 COT - LCEL - Electrical Above Ceiling Passed
11/17/2023 COT - LCPL - Plumbing Above Ceiling Passed
12/08/2023 COT - LCME - Mechanical Intermediate Passed
12/08/2023 COT - LCPL - Plumbing Intermediate Passed
12/08/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
12/08/2023 COT - LCEL - Electrical Intermediate Passed
12/11/2023 COT - LCME - Mechanical Progress Passed
12/11/2023 COT - LCEL - Electrical Progress Passed
12/11/2023 COT - LCBU - Building Above Ceiling Passed
12/11/2023 COT - LCBU - Building Progress Passed
12/11/2023 COT - LCPL - Plumbing Progress Passed
04/29/2024 COT - LCEL - Service Upgrade Passed 4/19/24: South Electrical Gear / Meter bank ECO CLEARANCE for (HPG1,GARG1,7101,7201,7301,7102,7203,7103,7302,7202,7303,7104,7204,7304,7105,7205,7305,7306,7206,7106)

4/29/24: North Electrical Gear / Meter Bank ECO CLEARANCE for (HPG2,7107,7108,7109,7110,7111,7112,7113,7114,7207,7208,7209,7210,7211,7212,7213,7214,7307,7308,7309,7310,7311,7312,7313,7314)
06/11/2024 COT - FCON - Alarm - Final Passed
06/24/2024 COT - LCBU - Sustainability Passed
07/09/2024 ENGR Engineering Final Passed
07/15/2024 COT - LCEL - Outdoor Lighting Passed
07/16/2024 COT - FCON - Sprinkler - Final Passed
07/16/2024 COT - LCBU - Building Final Passed
07/16/2024 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FINAL COFO.PDF DOCUMENTS VIEW
21-0973 - RESPONSE TO CITY ON INSPECTIONS - SEALED-2024-06-18_V1.PDF DOCUMENTS VIEW
SUBMITTAL _5 ALL BUILDING FLOOR TRUSSES-METT REVIEWED_V1.PDF DOCUMENTS VIEW
SUBMITTAL 6 REV1 SLOPED ROOF TRUSSES-METT REVIEWED_V1.PDF DOCUMENTS VIEW
TUCSON LANDING APTS BUILDING NO. 7-2024-05-13_V1.PDF DOCUMENTS VIEW
TUCSON LANDING LAB REPORT 4104 7108 6-4-24-2024-06-05_V1.PDF DOCUMENTS VIEW
TUCSON LANDING APTS BUILDING NO. 7-2024-05-13_V1.PDF DOCUMENTS VIEW
TUCSON LANDING LAB REPORT 4104 7108 6-4-24-2024-06-05_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE A.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE B.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE D.PDF DOCUMENTS VIEW
COMCHECK BLDG TYPE C.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
COMCHECK CLUBHOUSE.PDF DOCUMENTS VIEW
HVAC CALCULATIONS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET 1 OF 2.PDF CONSTRPLANS VIEW
PLAN SET 2 OF 2.PDF CONSTRPLANS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
SPECIFICATION MANUAL.PDF DOCUMENTS VIEW