Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Brad Samuels
Description:
210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5

Permit Reviews

Permit Number - T22CM01453
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/02/2022 COMPLETED Review Details
06/30/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
08/12/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/06/2022 COMPLETED Review Details
06/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/20/2024 APPROVED Review Details
06/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/17/2024 APPROVED Review Details

Conditions

Permit Number - T22CM01453
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Date Description Comments
06/11/2024 AIR BALANCING REPORT IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
06/11/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/12/2024 PCRWRD requests that the City of Tucson, add the PCRWRD Condition to the COT building permit #T22CM01449:ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATION IS ISSUED BY PDEQ FOR THE PRIVATE SEWER #P22SD00039 Gerry KoziolPima County DSD-Building Codes/Wastewater Utility Fee201 N Stone Ave Tucson, AZ 85701(520)724-6503
06/11/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
06/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/11/2024 WATER STERILIZATION REPORT IS REQUIRED.
06/11/2024 SHOP DRAWINGS REQUIRED FOR WOOD FLOOR JOISTS.
06/11/2024 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01453
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Total Outstanding Inspections - 20
Last Inspection Date Description Inspector Results Comments
01/04/2023 COT - LCBU - Preslab N/A Partial Pass housing units 4 & 5 pre-slab ready for pour.
04/28/2023 COT - LCPL - Backwater Valve N/A Not Applicable Building #5 does not require a Backwater Valve.
07/11/2023 COT - LCME - Mechanical Intermediate N/A Partial Pass tower 1 only
07/11/2023 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass tower 1 only
07/11/2023 COT - LCEL - Electrical Intermediate N/A Partial Pass tower 1 only
07/11/2023 COT - LCME - Mechanical Above Ceiling N/A Partial Pass tower one only
07/11/2023 COT - LCPL - Sewer N/A Partial Pass tower 1 only
07/11/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass tower 1 only
07/11/2023 COT - LCEL - Electrical Above Ceiling N/A Partial Pass
07/11/2023 COT - LCBU - Framing N/A Partial Pass tower 1 only
07/11/2023 COT - LCPL - Plumbing Above Ceiling N/A Partial Pass tower 1 only
07/11/2023 COT - LCPL - Plumbing Roof Drains N/A Partial Pass tower 1 only
07/11/2023 COT - HCBU - Interior Shear Bracing N/A Partial Pass tower 1 only
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
05/10/2024 BULD - Electrical Clearance N/A Not Applicable
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
04/18/2024 COT - FCON - Fire - Final N/A Partial Pass everything is approved. waiting for fence to be relocated.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01453
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Total Completed Inspections - 32
Date Description Inspector Results Comments
12/12/2022 COT - LCBU - Excavation/Rebar/Zoning Passed
01/05/2023 COT - LCPL - Rough Soil Passed
04/14/2023 COT - LCBU - Preslab Passed
04/28/2023 COT - LCBU - Roof Nailing Passed OSB sheathing is properly nailed off. Okay to begin roofing process.
04/28/2023 COT - LCEL - Electrical Underground Passed Underground electrical is complete from transformer to service panel.
05/04/2023 COT - LCBU - Exterior Clips/Sheathing Passed third floor
08/07/2023 COT - LCME - Mechanical Intermediate Passed
08/07/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed North breezeway.
08/14/2023 COT - LCEL - Electrical Intermediate Passed
08/14/2023 COT - LCME - Mechanical Above Ceiling Passed
08/14/2023 COT - LCPL - Sewer Passed
08/14/2023 COT - LCPL - Plumbing Intermediate Passed
08/14/2023 COT - LCEL - Electrical Above Ceiling Passed
08/14/2023 COT - LCBU - Framing Passed
08/14/2023 COT - LCPL - Plumbing Above Ceiling Passed
08/14/2023 COT - LCPL - Plumbing Roof Drains Passed
02/02/2024 COT - HCBU - Interior Shear Bracing Passed
02/02/2024 COT - LCEL - Service Upgrade Passed Clearance for units 5201, 5101, 5301, 5102, 5202, 5302, 5203, 5103, 5303, 5104, 5204, 5304, 5106, 5206, 5306 and HPE1

2/2/24: Clearance for HPE2 units 5107,5108,5109,5110,5111,5112,5113,5114, 5207,5208,5209,5210,5211,5212,5213,5214,5307,5308,5309,5310,5311,5312,5313,5314
03/28/2024 COT - FCON - Alarm - Final Passed
04/18/2024 COT - FCON - Sprinkler - Final Passed
05/10/2024 COT - LCEL - Electrical Final Passed 5/10/24: south half of building 5 passed.
05/10/2024 COT - LCBU - Building Progress Passed
05/10/2024 COT - LCBU - Sustainability Passed
05/10/2024 COT - LCEL - Electrical Progress Passed
05/10/2024 COT - LCME - Mechanical Progress Passed
05/10/2024 COT - LCPL - Plumbing Progress Passed
05/10/2024 COT - LCEL - Outdoor Lighting Passed
05/10/2024 COT - LCBU - Building Above Ceiling Passed
05/31/2024 COT - LCME - Mechanical Final Passed 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final.
5/13/24: building 5 level has passed. Waiting for engineering to pass in order to give Level 4 TCO
5/31/24: Building 5 ok for CofO
05/31/2024 COT - LCPL - Plumbing Final Passed 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final.
5/13/24: building 5 level has passed. Waiting for engineering to pass in order to give Level 4 TCO
5/31/24: Building 5 ok for CofO
05/31/2024 COT - LCBU - Building Final Passed 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final.
5/13/24: building 5 level has passed. Waiting for engineering to pass in order to give Level 4 TCO
5/31/24: Building 5 ok for CofO
05/31/2024 COT - FCON - Fire - Final Passed