Inspection Status: Not Ready

Inspection History: COT - LCME - Mechanical Final 

Date Description Inspector Results Comments
10/26/2022 COT - LCME - Mechanical Final  Not Ready
10/06/2022 COT - LCME - Mechanical Final  DBENOIT Prior to Final Inspectn Entered by DBENOIT1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION.
05/10/2024 COT - LCME - Mechanical Final  Partial Pass 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final.
05/13/2024 COT - LCME - Mechanical Final  Partial Pass 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final.
5/13/24: building 5 level has passed. Waiting for engineering to pass in order to give Level 4 TCO
05/31/2024 COT - LCME - Mechanical Final  Passed 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final.
5/13/24: building 5 level has passed. Waiting for engineering to pass in order to give Level 4 TCO
5/31/24: Building 5 ok for CofO