Permit: T22CM01453
Permit Details
Apply Date:
03/01/2022
Applicant:
Brent Stevens
Description:
210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Permit Reviews
Permit Number - T22CM01453
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 05/02/2022 | COMPLETED |
06/30/2022 | RESUBMITTAL | 07/19/2022 | COMPLETED |
08/12/2022 | RESUBMITTAL | 08/29/2022 | COMPLETED |
09/13/2022 | RESUBMITTAL | 09/26/2022 | COMPLETED |
10/03/2022 | RESUBMITTAL | 10/06/2022 | COMPLETED |
06/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/20/2024 | APPROVED |
06/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/17/2024 | APPROVED |
Conditions
Permit Number - T22CM01453
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Date | Description | Comments |
---|---|---|
06/11/2024 | AIR BALANCING REPORT IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
10/06/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE | |
06/11/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
06/12/2024 | PCRWRD requests that the City of Tucson, add the PCRWRD Condition to the COT building permit #T22CM01449:ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATION IS ISSUED BY PDEQ FOR THE PRIVATE SEWER #P22SD00039 Gerry KoziolPima County DSD-Building Codes/Wastewater Utility Fee201 N Stone Ave Tucson, AZ 85701(520)724-6503 | |
06/11/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/11/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
06/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
06/11/2024 | WATER STERILIZATION REPORT IS REQUIRED. | |
06/11/2024 | SHOP DRAWINGS REQUIRED FOR WOOD FLOOR JOISTS. | |
06/11/2024 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM01453
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Total Outstanding Inspections - 20
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/04/2023 | COT - LCBU - Preslab | N/A | Partial Pass | housing units 4 & 5 pre-slab ready for pour. |
04/28/2023 | COT - LCPL - Backwater Valve | N/A | Not Applicable | Building #5 does not require a Backwater Valve. |
07/11/2023 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | tower 1 only |
07/11/2023 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | tower 1 only |
07/11/2023 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | tower 1 only |
07/11/2023 | COT - LCME - Mechanical Above Ceiling | N/A | Partial Pass | tower one only |
07/11/2023 | COT - LCPL - Sewer | N/A | Partial Pass | tower 1 only |
07/11/2023 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | tower 1 only |
07/11/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | |
07/11/2023 | COT - LCBU - Framing | N/A | Partial Pass | tower 1 only |
07/11/2023 | COT - LCPL - Plumbing Above Ceiling | N/A | Partial Pass | tower 1 only |
07/11/2023 | COT - LCPL - Plumbing Roof Drains | N/A | Partial Pass | tower 1 only |
07/11/2023 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | tower 1 only |
10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready | |
05/10/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
04/18/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | everything is approved. waiting for fence to be relocated. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM01453
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities.Bldg 5
Total Completed Inspections - 32
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/12/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
01/05/2023 | COT - LCPL - Rough Soil | Passed | ||
04/14/2023 | COT - LCBU - Preslab | Passed | ||
04/28/2023 | COT - LCBU - Roof Nailing | Passed | OSB sheathing is properly nailed off. Okay to begin roofing process. | |
04/28/2023 | COT - LCEL - Electrical Underground | Passed | Underground electrical is complete from transformer to service panel. | |
05/04/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | third floor | |
08/07/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
08/07/2023 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | North breezeway. | |
08/14/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
08/14/2023 | COT - LCME - Mechanical Above Ceiling | Passed | ||
08/14/2023 | COT - LCPL - Sewer | Passed | ||
08/14/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
08/14/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
08/14/2023 | COT - LCBU - Framing | Passed | ||
08/14/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
08/14/2023 | COT - LCPL - Plumbing Roof Drains | Passed | ||
02/02/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
02/02/2024 | COT - LCEL - Service Upgrade | Passed | Clearance for units 5201, 5101, 5301, 5102, 5202, 5302, 5203, 5103, 5303, 5104, 5204, 5304, 5106, 5206, 5306 and HPE1 2/2/24: Clearance for HPE2 units 5107,5108,5109,5110,5111,5112,5113,5114, 5207,5208,5209,5210,5211,5212,5213,5214,5307,5308,5309,5310,5311,5312,5313,5314 |
|
03/28/2024 | COT - FCON - Alarm - Final | Passed | ||
04/18/2024 | COT - FCON - Sprinkler - Final | Passed | ||
05/10/2024 | COT - LCEL - Electrical Final | Passed | 5/10/24: south half of building 5 passed. | |
05/10/2024 | COT - LCBU - Building Progress | Passed | ||
05/10/2024 | COT - LCBU - Sustainability | Passed | ||
05/10/2024 | COT - LCEL - Electrical Progress | Passed | ||
05/10/2024 | COT - LCME - Mechanical Progress | Passed | ||
05/10/2024 | COT - LCPL - Plumbing Progress | Passed | ||
05/10/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
05/10/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
05/31/2024 | COT - LCME - Mechanical Final | Passed | 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final. 5/13/24: building 5 level has passed. Waiting for engineering to pass in order to give Level 4 TCO 5/31/24: Building 5 ok for CofO |
|
05/31/2024 | COT - LCPL - Plumbing Final | Passed | 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final. 5/13/24: building 5 level has passed. Waiting for engineering to pass in order to give Level 4 TCO 5/31/24: Building 5 ok for CofO |
|
05/31/2024 | COT - LCBU - Building Final | Passed | 5/10/24: South half of building 5 passed. labeling A/C units will have to be permanent prior to final. 5/13/24: building 5 level has passed. Waiting for engineering to pass in order to give Level 4 TCO 5/31/24: Building 5 ok for CofO |
|
05/31/2024 | COT - FCON - Fire - Final | Passed |