Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
02/28/2022
Applicant:
Meghan Rubin / Icon Power
Description:
Installation of an 8.03kW PV system with 1 Tesla PowerWall+ and 1 Tesla PowerWall2
Contractors:

Permit Reviews

Permit Number - T22CM01439
Permit Status: Final
Permit Description: Installation of an 8.03kW PV system with 1 Tesla PowerWall+ and 1 Tesla PowerWall2
Start Date Submittal Complete Date Status  
02/28/2022 OTHER 05/31/2022 COMPLETED Review Details
04/23/2022 RESUBMITTAL 05/31/2022 COMPLETED Review Details
06/24/2022 REVISION - - 1ST 07/20/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM01439
Permit Description: Installation of an 8.03kW PV system with 1 Tesla PowerWall+ and 1 Tesla PowerWall2
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/26/2022 TEP CLEARANCE - PM TGAUSP Approved CODE DGC/BAT
07/26/2022 ELECTRIC - FINAL TGAUSP Approved Approved, please send DGC and BAT clearance to TEP for the solar meter and battery back up
07/26/2022 BUILDING - FINAL TGAUSP Approved Approved

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CUT SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_REFERENCE SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_REVISION LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CUT SHEETS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
REV1_REFERENCE SHEETS.PDF DOCUMENTS VIEW
REV1_REVISION LETTER.PDF DOCUMENTS VIEW