Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
280 E 23RD ST
Address NEW:
280 E 23RD ST
Apply Date:
01/27/2022
Applicant:
Description:
SFR YEPIZ1368 T21-M0080

Permit Reviews

Permit Number - T22CM00639
Permit Status: Complete
Permit Description: SFR YEPIZ1368 T21-M0080
Start Date Submittal Complete Date Status  
01/27/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 02/22/2022 COMPLETED Review Details
03/24/2022 RESUBMITTAL 03/25/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM00639
Permit Status: Complete
Permit Description: SFR YEPIZ1368 T21-M0080
Total Outstanding Activity Conditions - 2
Date Name
01/27/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/27/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00639
Permite Description: SFR YEPIZ1368 T21-M0080
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00639
Permit Description: SFR YEPIZ1368 T21-M0080
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/17/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 05/17/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
05/17/2022 COT - RSBU - Preslab Passed {Activity date: 05/17/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved Ensure slab is termite treated. Ok to place concrete in progress areas.
}
05/17/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/17/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
06/22/2022 COT - RSBU - Roof Nailing Passed {Activity date: 06/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to dry in roof system.

}
06/22/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 06/22/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
08/08/2022 COT - LCBU - Framing Passed {Activity date: 08/08/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/04/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, install fire stop at all top plate penetrations, install nail protection where required.
}
08/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 08/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/08/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Electric only. Remove trash from inside of building; fire hazard.} ; {Activity date: 08/04/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, missing receptacle outlet in hall where 10’ is exceeded. Missing receptacle outlet in bedroom to meet 6’ -12’ rule.}
08/26/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 08/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/04/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, provide DWV and potable water test.}
08/26/2022 RSME - Mechanical Progress Passed {Activity date: 08/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/08/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Retape duct at main entry to master bedroom.} ; {Activity date: 08/04/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready}
09/01/2022 COT - RSEL - Construction Power Passed {Activity date: 09/01/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok for temp power.

CLEARANCE: Code: TMPP}
09/01/2022 BULD - Electrical Clearance Passed {Activity date: 09/01/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - CODE TMPP}
09/08/2022 COT - RSPL - Sewer Passed {Activity date: 09/08/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover progress areas} ; {Activity date: 09/07/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by VVERA1 - NR, cancelled by contractor} ; {Activity date: 09/01/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Contractor cancelled.

}
02/17/2023 COT - RSPL - Yard Water Line Passed okay to backfill. shading required
03/09/2023 COT - RSPL - Plumbing Final Passed
03/09/2023 COT - RSEL - Electrical Final Passed
03/09/2023 COT - RSME - Mechanical Final Passed
03/09/2023 COT - RSEL - Outdoor Lighting Passed
03/09/2023 RSBU - Building Final Passed
04/05/2023 COT - RSPL - Rough Soil Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW