Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
08/11/2021
Applicant:
TROY NEIMAN
Description:
Rain and Ridges Public Art Installation within traffic circle at intersection of N Camino Miramonte and E 3rd St.
Phase 1- Aug 18-20st 2021 (if possible). All work will be done within the existing traffic circle and existing ballards. We will provide additional cones and caution tape around ballards. Traffic or accessibility will not be impacted. Phase 1 work to include excavation of x6 footers to be 1'6''sq holes by 2'6" depth. Fill with concrete.
Phase 2- Install artwork (approx mid Sep 2021). Install to be done by Hook Crane Services. Install is estimated to take approx 60min on site. Will work with Hook to determine temporary traffic control needs prior to install once the install date has been determined.