Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel125122040
JurisdictionTucson, Pima County
Water Course

Street+culvert

City of Tucson ZoningR-1
Tucson WardWard 6
Tucson Registered NeighborhoodMiramonte
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 3322 E 3RD ST
Date - 08/19/2026 7:49 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-53-31 Encanto Park 1402 1419

Permits

Address: 3322 E 3RD ST
Date - 08/19/2026 7:49 a.m.
Total Number Of Permits - (10)
Permit Status Apply Date Expired Date Unit Type Description
T20OT00827 Issued 12/18/2020 07/11/2021 Floodplain Use FUP for T20CM07780
T19CM06726 Expired 09/16/2019 03/14/2020 Residential Building - One or Two Family E - NEW 5 TON HEAT PUMP
T00CM00919 FINAL 02/25/2000 04/16/2019 COMBO ADDITION:MUSIC ROOM/STUDY
T18RW00607 FINAL 02/02/2018 03/10/2018 ROW REPLACE CONCRETE IN SIDEWALK AREA AND RESET METER BOX
T18RW01422 FINAL 03/26/2018 05/02/2018 ROW REPLACE CONCRETE IN SIDEWALK AREA AND RESET METER BOX
T19CM06727 VOID 09/16/2019 N/A COMBO E - NEW 5 TON HEAT PUMP
T19CM07369 FINAL 10/08/2019 06/13/2020 COMBO ROOF MOUNTED SOLAR PV SYSTEM
T20CM00721 FINAL 01/30/2020 08/02/2020 COMBO E - REPLACE EXTERIOR WATERLINE
T20CM07780 FINAL 11/09/2020 06/16/2021 COMBO SOLAR ALTERATION
T21RW03687 FINAL 08/11/2021 10/16/2021 ROW Rain and Ridges Public Art Installation within traffic circle at intersection of N Camino Miramonte and E 3rd St. Phase 1- Aug 18-20st 2021 (if possible). All work will be done within the existing traffic circle and existing ballards. We will provide additional cones and caution tape around ballards. Traffic or accessibility will not be impacted. Phase 1 work to include excavation of x6 footers to be 1'6''sq holes by 2'6" depth. Fill with concrete. Phase 2- Install artwork (approx mid Sep 2021). Install to be done by Hook Crane Services. Install is estimated to take approx 60min on site. Will work with Hook to determine temporary traffic control needs prior to install once the install date has been determined.