Permit: T21CM09874
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
4107 N CACTUS BL 2
Address NEW:
4107 N CACTUS BL 2
Apply Date:
12/27/2021
Applicant:
Description:
Studio
Permit Reviews
Permit Number - T21CM09874
Permit Status: Issued
Permit Description: Studio
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/11/2022 | RESUBMITTAL | 05/04/2022 | COMPLETED |
| 12/27/2021 | 3RD PARTY REVIEW - RESIDENTIAL | 03/02/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T21CM09874
Permit Status: Issued
Permit Description: Studio
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/04/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm |
| 05/04/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM09874
Permite Description: Studio
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM09874
Permit Description: Studio
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/26/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap Interior to 3’ outside slab ok to backfill.} ; {Activity date: 05/06/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} |
|
| 06/06/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/06/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 06/06/2022 | COT - RSBU - Preslab | Passed | {Activity date: 06/06/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 06/06/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 06/06/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 06/06/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/06/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 07/07/2022 | COT - RSBU - Masonry Pregrout | Passed | {Activity date: 07/07/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap Ok to grout to top out. } ; {Activity date: 06/30/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Second lift including lintels.} ; {Activity date: 06/23/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa Ok to grout 1st lift of all walls. } |
|
| 08/09/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 09/09/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for connection to septic system, okay to backfill progress areas} | |
| 09/14/2022 | RSME - Mechanical Progress | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 09/19/2022 | COT - LCBU - Framing | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/14/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval please install nail stops at 2 inch vent to roof at toilet top plate } |
|
| 09/19/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 09/19/2022 | RSEL - Electrical Progress | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/14/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - partial approval Please replace pancake boxes with fan boxes per plans } |
|
| 10/13/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/13/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
| 10/17/2022 | COT - RSBU - Sustainability | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 10/17/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
| 12/27/2022 | COT - RSPL - Gas Pressure Test | Passed | holding 15 psi | |
| 12/27/2022 | COT - RSPL - Gas Reconnect | Passed | ||
| 12/27/2022 | COT - BULD - SWG Clearance | Passed | clearance for Southwest Gas. | |
| 03/10/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 03/10/2023 | COT - RSEL - Electrical Final | Passed | ||
| 03/10/2023 | COT - RSME - Mechanical Final | Passed | ||
| 03/10/2023 | RSBU - Building Final | Passed | ||
| 03/10/2023 | COT - RSBU - Stem Wall/Retaining Wall | Passed |