Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/17/2021
Applicant:
Description:
Health Clinic

Permit Reviews

Permit Number - T21CM09661
Permit Status: Complete
Permit Description: Health Clinic
Start Date Submittal Complete Date Status  
02/11/2022 RESUBMITTAL 03/10/2022 COMPLETED Review Details
03/10/2022 RESUBMITTAL 03/21/2022 COMPLETED Review Details
04/01/2022 RESUBMITTAL 04/12/2022 COMPLETED Review Details
12/17/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 02/02/2022 COMPLETED Review Details
11/17/2022 COMMERCIAL REVIEW - FULL v.1 11/18/2022 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM09661
Permit Status: Complete
Permit Description: Health Clinic
Total Outstanding Activity Conditions - 1
Date Name
11/30/2022 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Conditions

Permit Number - T21CM09661
Permit Status: Complete
Permit Description: Health Clinic
Date Description Comments
04/12/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/12/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/12/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/12/2022 SHOP DRAWINGS REQUIRED FOR SPRINKLERS.
09/29/2022 WATER CHLORINATION REPORT REQUIRED

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM09661
Permite Description: Health Clinic
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/04/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 10/04/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - N/A} ; {Activity date: 06/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Southwest gas clearance is required.

} ; {Activity date: 06/10/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim

} ; {Activity date: 04/20/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa
All under slab rough plumbing ok to backfill.}
10/04/2022 COT - LCME - Mechanical Intermediate N/A Canceled {Activity date: 10/04/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - N/A} ; {Activity date: 08/24/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval Seismic missing on some diffusers

} ; {Activity date: 06/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Southwest gas clearance is required.

} ; {Activity date: 06/10/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim

}
10/04/2022 COT - LCBU - Building Progress N/A Canceled {Activity date: 10/04/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - N/A}
11/04/2022 COT - LCPL - Plumbing Progress N/A Canceled Inspection Canceled
11/04/2022 COT - LCME - Mechanical Progress N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09661
Permit Description: Health Clinic
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/20/2022 COT - LCEL - Electrical Progress Passed {Activity date: 04/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
05/09/2022 COT - LCME - Mechanical Final Passed {Activity date: 05/09/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
All duct work ok to be wrapped.} ; {Activity date: 04/12/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION}
05/12/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 05/12/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
Potable and dwv ok above.}
06/14/2022 COT - LCPL - Gas Pressure Test Passed {Activity date: 06/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Southwest gas clearance is required.

}
06/14/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 06/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Southwest gas clearance is required.

} ; {Activity date: 06/10/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim

} ; {Activity date: 06/06/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval ok to one side interior walls only

} ; {Activity date: 04/20/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa
Under slab conduits ok}
06/14/2022 COT - LCBU - Framing Passed {Activity date: 06/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Southwest gas clearance is required.

} ; {Activity date: 06/10/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Jim

}
06/14/2022 COT - BULD - SWG Clearance Passed {Activity date: 06/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - CODE GAS}
06/27/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 06/27/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
08/26/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 08/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/26/2022 COT - FCON - Fire - Final Passed {Activity date: 09/26/2022; Status: Approved; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - }
09/30/2022 COT - LCPL - Plumbing Final Passed {Activity date: 09/30/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} ; {Activity date: 09/29/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} ; {Activity date: 09/27/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor} ; {Activity date: 09/21/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready

} ; {Activity date: 07/12/2022; Status: Cancelled; Inspector: DQUINN; Comment: Entered by NGARCIA3 - ca
Per contractor} ; {Activity date: 04/12/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION}
10/04/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 10/04/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/21/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready

} ; {Activity date: 08/24/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready
}
10/04/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 10/04/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/24/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval awaiting relocation of sub panel
}
10/06/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/06/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE REC} ; {Activity date: 10/06/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE INCR}
11/03/2022 COT - HCEL - Electrical Progress Passed 400amp service box has been installed, labeled and scheduled.
11/03/2022 COT - LCEL - Electrical Final Passed Please call James Ericson 385-910-4874
11/07/2022 COT - LCEL - Service Upgrade Passed {Activity date: 10/06/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by NGARCIA3 - pa

Clear incr/rec

This is a partial inc, meter power kill, just to pull new feeders to back ordered 400 amp panel.} ; {Activity date: 09/30/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by VVERA1 - nr
Panel on back order till end of oct.
}
11/08/2022 COT - LCBU - Building Final Passed
11/10/2022 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SCHEDULE OF SPECIAL INSPECTIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STATEMENT OF SPECIAL INSPECIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
T21CM09661 - TCO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SCHEDULE OF SPECIAL INSPECTIONS.PDF DOCUMENTS VIEW
STATEMENT OF SPECIAL INSPECIONS.PDF DOCUMENTS VIEW
T21CM09661 - TCO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
22I0140_2 TURNER 09 14 2022 0933 DRINKING WATER ARCHWELL HEALTH CAMPBELL FAIR - COPY_V1.PDF DOCUMENTS VIEW
22I0140_2 TURNER 09 14 2022 0933 DRINKING WATER ARCHWELL HEALTH CAMPBELL FAIR_V1.PDF DOCUMENTS VIEW
T-B REPORT NORTH CAMPBELL_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW