Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM09517
Permit Details
Apply Date:
12/13/2021
Applicant:
Lisa Bowers
Description:
Private Sewer for Brioso at the Bridges
Permit Reviews
Permit Number - T21CM09517
Permit Status: Complete
Permit Description: Private Sewer for Brioso at the Bridges
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/15/2022 | RESUBMITTAL | 01/19/2022 | COMPLETED |
12/13/2021 | OTHER | 01/11/2022 | COMPLETED |
Conditions
Permit Number - T21CM09517
Permit Status: Complete
Permit Description: Private Sewer for Brioso at the Bridges
Date | Description | Comments |
---|---|---|
12/06/2022 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM09517
Permit Description: Private Sewer for Brioso at the Bridges
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/25/2022 | PDSD Building Division Pre-Construction Meeting | Passed | {Activity date: 01/25/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - Approved} | |
06/03/2022 | COT - LCPL - Sewer | Passed | {Activity date: 06/03/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, AIR TEST FOR MH 3-4, 4-5 PASS. MANDRIL FROM MH2-3 PASS. } ; {Activity date: 06/02/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Air test pass from Manhole 1-3, Mandril pass from Manhole 4-5, 3-4, 3-6. } ; {Activity date: 04/20/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for lateral line from MH#6 to C/O#2 ok to backfill } ; {Activity date: 04/19/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. 4" lateral sewer line to 8" main sewer line. Approximately 60 ‘. Ok to cover progress areas. } ; {Activity date: 04/18/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for 8”mainline between MH-3 and MH-4, and 8” main line with 3 stubs and lateral at 36 09.71 with 6 stub-outs between MH-4 and MH-5 } ; {Activity date: 04/11/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial, 4” lateral and stubs from the main line at station 33 37.98, also 4” lateral and stubs at 35 32.36 coming from manhole 4 headed west, okay to backfill progress areas.} ; {Activity date: 04/07/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Sewer laterals @ following stations ok to backfill (31 24.39, 31 82.64, 32 40.63)} ; {Activity date: 03/31/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for vacuum test of manholes #1, #2, #3, #6 (Passed) } ; {Activity date: 03/17/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for 8” main from MH-3 to MH-6, okay to backfill progress areas } ; {Activity date: 03/10/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Mandril PASS from public manhole to manhole 1.} ; {Activity date: 03/09/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Sewer main Test results. ( Manhole 1 to Public Manhole 295’ air Test PASS, Manhole 1-2 Mandril PASS).} ; {Activity date: 03/07/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Lateral installation and Air test for mainline North of Manhole 1 passed} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial for 4” lateral from main from MH 1 heading east station 31 07.10 and 3 stub outs, also 4” lateral and 6 stub outs at station 32 05.31, okay to backfill } ; {Activity date: 02/22/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 4” Laterals off of main line and manhole 2 ok to backfill progress areas.} ; {Activity date: 02/15/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial, for HCS and complete 4” lateral at station 15 17.26 heading east 200’, okay to backfill progress areas } ; {Activity date: 02/14/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, 8” Main From MH 1 heading south installed with 3 - 4” HCS laterals ending at station-31 82.64, ok to proceed.} ; {Activity date: 02/11/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial,8” Main From MH 1 heading EAST installed with 6-4” HCS laterals ok to proceed.} ; {Activity date: 02/07/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Main line and HCS connections heading North towards Manhole 2 ok to backfill progress areas.} ; {Activity date: 02/04/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Partial for 8” main from Manhole 1 due north to laterals HCS 465 east, HCS 467 east, HCS 468 west, HCS 470 east, ending at HCS 471 west. Okay to backfill progress areas Drop to add an attachment } ; {Activity date: 02/02/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, continued progress on the 8” sewer main, and building manhole 1.} ; {Activity date: 01/31/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Continued progress on 8” sewer main with two lateral connections ok to backfill progress towards manhole 1.} ; {Activity date: 01/28/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial , 8” Main line and tracer installed Progress from public manhole heading East ok to backfill progress areas.} ; {Activity date: 01/26/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, 20’ of 8” sewer main from public manhole heading East ok to backfill progress areas and proceed. } ; {Activity date: 01/25/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - - Partial, PUBLIC MANHOLE cored and ready to set 8” main.} |
|
02/05/2024 | COT - LCPL - Plumbing Final | Passed |