Permit: T21CM09517

Parcel: 13213066A


Addresses:

2805 S PARK AV


Inspection Status: Passed

Inspection History: COT - LCPL - Sewer 

Permit Number - T21CM09517

Inspection Description - COT - LCPL - Sewer 

Inspection Status - Passed

Date Description Inspector Results Comments
06/02/2022 COT - LCPL - Sewer  DMUNIZ Approved Entered by NGARCIA3 - Approved
01/26/2022 COT - LCPL - Sewer  DMUNIZ Not ready for Inspection Entered by VVERA1 - Not Ready
06/03/2022 COT - LCPL - Sewer  DMUNIZ Approved Entered by NGARCIA3 - Approved, AIR TEST FOR MH 3-4, 4-5 PASS. MANDRIL FROM MH2-3 PASS.
06/02/2022 COT - LCPL - Sewer  DMUNIZ Approved Entered by NGARCIA3 - Partial, Air test pass from Manhole 1-3, Mandril pass from Manhole 4-5, 3-4, 3-6.
04/20/2022 COT - LCPL - Sewer  WGALLAGHER Partial Approval Entered by VVERA1 - Partial approval for lateral line from MH#6 to C/O#2 ok to backfill
04/19/2022 COT - LCPL - Sewer  JBURGE Partial Approval Entered by NGARCIA3 - Partial. 4" lateral sewer line to 8" main sewer line. Approximately 60 ‘. Ok to cover progress areas.
04/18/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by VVERA1 - Partial for 8”mainline between MH-3 and MH-4, and 8” main line with 3 stubs and lateral at 36 09.71 with 6 stub-outs between MH-4 and MH-5
04/11/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by VVERA1 - Partial, 4” lateral and stubs from the main line at station 33 37.98, also 4” lateral and stubs at 35 32.36 coming from manhole 4 headed west, okay to backfill progress areas.
04/07/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by NGARCIA3 - Partial, Sewer laterals @ following stations ok to backfill (31 24.39, 31 82.64, 32 40.63)
03/31/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by NGARCIA3 - Partial for vacuum test of manholes #1, #2, #3, #6 (Passed)
03/17/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by NGARCIA3 - Partial for 8” main from MH-3 to MH-6, okay to backfill progress areas
03/10/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by VVERA1 - Partial, Mandril PASS from public manhole to manhole 1.
03/09/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by NGARCIA3 - Partial, Sewer main Test results. ( Manhole 1 to Public Manhole 295’ air Test PASS, Manhole 1-2 Mandril PASS).
03/07/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by VVERA1 - Partial, Lateral installation and Air test for mainline North of Manhole 1 passed
03/02/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by NGARCIA3 - - Partial for 4” lateral from main from MH 1 heading east station 31 07.10 and 3 stub outs, also 4” lateral and 6 stub outs at station 32 05.31, okay to backfill
02/22/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by VVERA1 - Partial, 4” Laterals off of main line and manhole 2 ok to backfill progress areas.
02/15/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by VVERA1 - Partial, for HCS and complete 4” lateral at station 15 17.26 heading east 200’, okay to backfill progress areas
02/14/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by NGARCIA3 - Partial, 8” Main From MH 1 heading south installed with 3 - 4” HCS laterals ending at station-31 82.64, ok to proceed.
02/11/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by VVERA1 - Partial,8” Main From MH 1 heading EAST installed with 6-4” HCS laterals ok to proceed.
02/07/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by VVERA1 - Partial, Main line and HCS connections heading North towards Manhole 2 ok to backfill progress areas.
02/04/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by RSALDAT1 - Partial for 8” main from Manhole 1 due north to laterals HCS 465 east, HCS 467 east, HCS 468 west, HCS 470 east, ending at HCS 471 west. Okay to backfill progress areas Drop to add an attachment
02/02/2022 COT - LCPL - Sewer  TGAUSP Partial Approval Entered by NGARCIA3 - Partial, continued progress on the 8” sewer main, and building manhole 1.
01/31/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by RSALDAT1 - Partial, Continued progress on 8” sewer main with two lateral connections ok to backfill progress towards manhole 1.
01/28/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by VVERA1 - Partial , 8” Main line and tracer installed Progress from public manhole heading East ok to backfill progress areas.
01/26/2022 COT - LCPL - Sewer  DMUNIZ Partial Approval Entered by VVERA1 - PARTIAL, 20’ of 8” sewer main from public manhole heading East ok to backfill progress areas and proceed.
01/25/2022 COT - LCPL - Sewer  RCHANDLER Partial Approval Entered by RSALDAT1 - - Partial, PUBLIC MANHOLE cored and ready to set 8” main.