Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/07/2021
Applicant:
Description:
New Commercial Shell Bldg

Permit Reviews

Permit Number - T21CM09399
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Start Date Submittal Complete Date Status  
05/23/2022 REVISION - - 1ST 06/29/2022 COMPLETED Review Details
12/07/2021 3RD PARTY REVIEW - COMMERCIAL 02/04/2022 COMPLETED Review Details

Conditions

Permit Number - T21CM09399
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Date Description Comments
01/25/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/25/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
01/25/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
01/25/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
01/25/2022 SHOP DRAWINGS REQUIRED FOR WOOD "I" JOISTS.
01/25/2022 SPECIAL INSPECTION IS REQUIRED FOR EARTHWORK.
01/25/2022 SPECIAL INSPECTION IS REQUIRED FOR EIFS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM09399
Permite Description: New Commercial Shell Bldg
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/07/2022 COT - HCBU - Exterior Clips/Sheathing N/A Canceled {Activity date: 07/07/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - - Not Applicable.}
07/07/2022 COT - LCPL - Medical Gas Preconstruction Mtg N/A Canceled {Activity date: 07/07/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - - Not Applicable.}
07/07/2022 COT - LCPL - Medical Gas/Test N/A Canceled {Activity date: 07/07/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - - Not Applicable.}

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09399
Permit Description: New Commercial Shell Bldg
Total Completed Inspections - 37
Date Description Inspector Results Comments
03/23/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 03/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved Shop 16}
04/05/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 04/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
04/26/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 04/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for the 5th lift (top of wall) for the 3 masonry walls} ; {Activity date: 04/25/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, N,S,W CMU walls for shop 16 topped out and ok to grout.} ; {Activity date: 04/21/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial - 4th lift (20’) for the 3 masonry walls} ; {Activity date: 04/14/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial - 3rd lift (15’) for the 3 masonry walls} ; {Activity date: 04/12/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial - 2nd lift (10’) for the 3 masonry walls} ; {Activity date: 04/08/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial - 1st lift for the 3 masonry walls} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for stem wall at north, east and west}
05/04/2022 COT - LCPL - Rough Soil Passed {Activity date: 05/04/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for waste and grease, connected to existing main, okay to backfill progress areas}
05/18/2022 COT - LCBU - Preslab Passed {Activity date: 05/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
05/18/2022 COT - LCPL - Yard Water Line Passed {Activity date: 05/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved 2” water from meter to building, okay to backfill progress areas}
05/23/2022 COT - LCEL - Electrical Underground Passed {Activity date: 05/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for electrical lines from property line to building, okay to backfill

} ; {Activity date: 04/07/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for conduits starting at the SES location going along north wall and east walls to interior panels, okay to backfill}
06/07/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 06/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for Trash Enclosure, okay for concrete placement} ; {Activity date: 03/31/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for building #16 column footings, okay to place concrete} ; {Activity date: 03/23/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial for Shop 16 building foundation on East, West and South walls, okay to pour}
06/08/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 06/08/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
06/08/2022 COT - LCBU - Roof Nailing Passed {Activity date: 06/08/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
06/10/2022 COT - LCEL - Electrical Progress Passed {Activity date: 06/10/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -AP. Rough in for boxes in walls.

}
06/10/2022 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 06/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
06/10/2022 COT - LCBU - Building Progress Passed {Activity date: 06/10/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP Drywall.}
06/24/2022 COT - LCBU - Framing Passed {Activity date: 06/24/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/10/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 06/08/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/01/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for metal stud framing above the entry storefront

}
09/14/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - CODE ECO/UNITS #T1, #T2, #T3, and House Panel} ; {Activity date: 09/02/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE ECO/UNITS #T1, #T2, #T3, and House Panel}
09/19/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/19/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to set meter and energize system*NOTE: Two additional transformers to be added to building during Tenant improvement on separate permit.

CLEARANCE: Code: ECO.}
09/19/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/19/2022 COT - LCBU - Sustainability Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/19/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/17/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Lighting cans in outside soffit and electrical boxes for lighting on side of building}
09/19/2022 BULD - Electrical Clearance Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - CODE ECO}
09/19/2022 COT - LCPL - Plumbing Final Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/19/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/24/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for front portion of demising wall, okay to tape progress areas}
10/03/2022 COT - LCPL - Plumbing Progress Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCEL - Outdoor Lighting Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/07/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for copper water supply lines within building}
10/03/2022 COT - LCEL - Electrical Final Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/02/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for service panels}
10/03/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCPL - Sewer Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/14/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - }
10/18/2022 COT - LCME - Mechanical Final Passed {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by KROBLES1 - }
10/18/2022 COT - LCEL - Construction Power Passed {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by KROBLES1 - }
10/18/2022 COT - FCON - Alarm - Final Passed {Activity date: 10/18/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - } ; {Activity date: 10/14/2022; Status: Denied; Inspector: CGates; Comment: Entered by CGATES1 - Fire alarm did not transmit signals.}
10/18/2022 COT - FCON - Fire - Final Passed {Activity date: 10/18/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - } ; {Activity date: 10/14/2022; Status: Denied; Inspector: CGates; Comment: Entered by CGATES1 - Fire alarm did not transmit signals.}
10/19/2022 COT - LCBU - Building Final Passed {Activity date: 10/19/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - APPROVED, pending special inspections and reports required} ; {Activity date: 10/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by KROBLES1 - } ; {Activity date: 10/03/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - PARTIAL, pending Fire, and all Reports and Conditions are satisfied}
12/02/2022 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FINAL SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOIST SHOP DRAWINGS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FINAL SIC.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REV1_JOIST SHOP DRAWINGS.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COMCHECK.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECH EVALUATION.PDF DOCUMENTS VIEW
CUT SHEETS LIGHTING.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
STRUCTURAL CACLS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW