Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
9517 E OLD VAIL RD
Apply Date:
11/15/2021
Applicant:
Description:
New veterinary surgery center

Permit Reviews

Permit Number - T21CM08913
Permit Status: Complete
Permit Description: New veterinary surgery center
Start Date Submittal Complete Date Status  
02/14/2022 RESUBMITTAL 04/28/2022 COMPLETED Review Details
05/10/2022 RESUBMITTAL 05/16/2022 COMPLETED Review Details
11/15/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 01/31/2022 COMPLETED Review Details
11/30/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/01/2023 APPROVED Review Details

Conditions

Permit Number - T21CM08913
Permit Status: Complete
Permit Description: New veterinary surgery center
Date Description Comments
12/01/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/28/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/28/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
04/28/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
04/28/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
04/28/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/28/2022 SHOP DRAWINGS REQUIRED FOR SPRINKLERS
04/28/2022 SHOP DRAWINGS REQUIRED FOR METAL BUILDING AND COMPONENTS
12/01/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08913
Permite Description: New veterinary surgery center
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - FCON - Underground Pressure N/A Not Ready
07/06/2023 COT - LCPL - Plumbing Intermediate N/A Partial Pass 7-6-24: All except Room 120.
07/14/2023 COT - LCBU - Building Progress N/A Partial Pass ok to pour the trash enclosure footer with minor adjustments to the rebar layout. Bollard layout is not shown at this time
COT - FCON - Sprinkler - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08913
Permit Description: New veterinary surgery center
Total Completed Inspections - 35
Date Description Inspector Results Comments
11/15/2022 COT - LCBU - Excavation/Rebar/Zoning Passed
11/15/2022 COT - LCBU - Preslab Passed
03/28/2023 COT - HCPL - Yard Water Line Passed
07/06/2023 COT - LCEL - Electrical Intermediate Passed
07/06/2023 COT - LCPL - Plumbing Above Ceiling Passed
07/06/2023 COT - LCME - Mechanical Intermediate Passed
07/06/2023 COT - LCBU - Framing Passed
07/18/2023 COT - HCBU - Interior Shear Bracing Passed
09/08/2023 PDSD Building Division - Sign Caisson Passed light pole.
09/08/2023 COT - LCBU - Building Above Ceiling Passed
09/08/2023 COT - LCME - Mechanical Above Ceiling Passed
09/08/2023 COT - LCEL - Electrical Above Ceiling Passed
09/15/2023 BULD - Electrical Clearance Passed Approved 600A 3phase service, 3/0 cu ground. ECO Clearance to TEP is required
09/20/2023 COT - LCEL - Electrical Progress Passed TEP ECO 600A 3PH 4WIRE
11/14/2023 COT - LCPL - Rough Soil Passed
11/14/2023 COT - LCPL - Plumbing Progress Passed
11/14/2023 COT - LCBU - Roof Nailing Passed
11/14/2023 COT - FCON - Underground Pressure Passed Approved on 6/6/23 on permit T22FCP00356
11/14/2023 COT - HCEL - Electrical Underground Passed
11/14/2023 COT - LCBU - Exterior Clips/Sheathing Passed
11/14/2023 COT - LCEL - Outdoor Lighting Passed
11/14/2023 COT - LCME - Mechanical Progress Passed
11/14/2023 COT - LCBU - Sustainability Passed
11/14/2023 COT - LCPL - Plumbing Intermediate Passed
05/17/2024 COT - LCBU - Building Progress Passed
11/30/2023 FCON – OH Piping & Hydro Passed
11/30/2023 COT - FCON - Underground Flush Passed
11/30/2023 COT - FCON - Sprinkler - Final Passed
11/30/2023 COT - FCON - Alarm - Final Passed
11/30/2023 COT - FCON - Fire - Final Passed
12/01/2023 COT - LCPL - Plumbing Final Passed
12/01/2023 COT - LCEL - Electrical Final Passed
12/01/2023 COT - LCME - Mechanical Final Passed
12/01/2023 COT - LCBU - Building Final Passed
12/05/2023 ENGR Engineering Final Passed OK for Level 4 C of O

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
T21CM08913 SIC-2023-11-29_V1.PDF DOCUMENTS VIEW
T21CM08913 TEST AND BALANCE_V1.PDF DOCUMENTS VIEW
T21CM08913 WATER_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
LOAD CALC.PDF DOCUMENTS VIEW
GCL, SEWER AND BOND EXEMPTION.PDF DOCUMENTS VIEW
GENERAL CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
LOAD CALCS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW