Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
11/15/2021
Applicant:
Jesus Luna
Description:
SFR Unit 1

Permit Reviews

Permit Number - T21CM08890
Permit Status: Complete
Permit Description: SFR Unit 1
Start Date Submittal Complete Date Status  
01/15/2022 RESUBMITTAL 02/17/2022 COMPLETED Review Details
11/23/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 01/06/2022 COMPLETED Review Details
10/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/16/2025 REQUIRES RESUBMIT Review Details
11/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.4 11/19/2025 APPROVED Review Details
09/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/18/2025 REQUIRES RESUBMIT Review Details
10/27/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 10/28/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM08890
Permit Status: Complete
Permit Description: SFR Unit 1
Date Description Comments
01/27/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
08/27/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08890
Permite Description: SFR Unit 1
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
09/11/2023 COT - LCPL - Plumbing Intermediate N/A Re-inspection required 1-Toilet in Master Bathroom does not have 24" of clearance in front.
10/27/2022 COT - LCBU - Framing N/A Not Ready
09/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 1-Need tempered glass by front door. 2- Add receptacle at Master vanity. 3-Remove screen from dryer vent roof jack.
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
04/02/2025 COT - RSEL - Construction Power N/A Partial Pass 4-2-25, electrical clearance was issued back in 2024. Per customer, there was an issue with dividing the parcels but that has been resolved. I re-checked the panel and is approved to be energized. Customer asked to follow up with TEP.
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08890
Permit Description: SFR Unit 1
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/29/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/29/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved to clean out, pending HCS

}
07/15/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 07/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
07/15/2022 COT - RSBU - Preslab Passed {Activity date: 07/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
07/15/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 07/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
03/22/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/22/2023 COT - RSBU - Roof Nailing Passed
09/11/2023 RSME - Mechanical Progress Passed
09/27/2023 COT - LCPL - Plumbing Intermediate Passed Corrections were made. 9/27/2023
09/27/2023 COT - LCBU - Framing Passed
09/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 9/27/2023
01/17/2024 COT - HCBU - Interior Shear Bracing Passed
08/08/2024 COT - RSPL - Sewer Passed
05/06/2025 BULD - Electrical Clearance Passed Approved new 200A service panel - ECO Clearance is required (1st clearance expired)
08/07/2025 COT - RSPL - Yard Water Line Passed
08/07/2025 COT - RSEL - Electrical Underground Passed
08/07/2025 COT - RSEL - Construction Power Passed
08/14/2025 COT - RSEL - Electrical Final Passed
08/14/2025 COT - RSEL - Outdoor Lighting Passed
08/14/2025 COT - RSME - Mechanical Final Passed
08/14/2025 COT - RSPL - Plumbing Final Passed
08/14/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2914 S COTTONWOOD LANE-LAYOUT AND CALCPACKAGE WY STMP_V4.PDF DOCUMENTS VIEW
OWNER-BUILDER-AFFIDAVIT_073025_FILLABLE_V1.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW