Permit: T21CM08890
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2914 S COTTONWOOD LN UNIT 1
Address NEW:
2914 S COTTONWOOD LN UNIT 1
Apply Date:
11/15/2021
Applicant:
Jesus Luna
Description:
SFR Unit 1
Permit Reviews
Permit Number - T21CM08890
Permit Status: Complete
Permit Description: SFR Unit 1
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/15/2022 | RESUBMITTAL | 02/17/2022 | COMPLETED |
| 11/23/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 01/06/2022 | COMPLETED |
| 10/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/16/2025 | REQUIRES RESUBMIT |
| 11/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 11/19/2025 | APPROVED |
| 09/18/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/18/2025 | REQUIRES RESUBMIT |
| 10/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 10/28/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - T21CM08890
Permit Status: Complete
Permit Description: SFR Unit 1
| Date | Description | Comments |
|---|---|---|
| 01/27/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 08/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM08890
Permite Description: SFR Unit 1
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2023 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | 1-Toilet in Master Bathroom does not have 24" of clearance in front. |
| 10/27/2022 | COT - LCBU - Framing | N/A | Not Ready | |
| 09/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1-Need tempered glass by front door. 2- Add receptacle at Master vanity. 3-Remove screen from dryer vent roof jack. |
| 10/26/2022 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
| 04/02/2025 | COT - RSEL - Construction Power | N/A | Partial Pass | 4-2-25, electrical clearance was issued back in 2024. Per customer, there was an issue with dividing the parcels but that has been resolved. I re-checked the panel and is approved to be energized. Customer asked to follow up with TEP. |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM08890
Permit Description: SFR Unit 1
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/29/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved to clean out, pending HCS } |
|
| 07/15/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 07/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 07/15/2022 | COT - RSBU - Preslab | Passed | {Activity date: 07/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 07/15/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 03/22/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/22/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 09/11/2023 | RSME - Mechanical Progress | Passed | ||
| 09/27/2023 | COT - LCPL - Plumbing Intermediate | Passed | Corrections were made. 9/27/2023 | |
| 09/27/2023 | COT - LCBU - Framing | Passed | ||
| 09/27/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 9/27/2023 | |
| 01/17/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 08/08/2024 | COT - RSPL - Sewer | Passed | ||
| 05/06/2025 | BULD - Electrical Clearance | Passed | Approved new 200A service panel - ECO Clearance is required (1st clearance expired) | |
| 08/07/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 08/07/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 08/07/2025 | COT - RSEL - Construction Power | Passed | ||
| 08/14/2025 | COT - RSEL - Electrical Final | Passed | ||
| 08/14/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/14/2025 | COT - RSME - Mechanical Final | Passed | ||
| 08/14/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/14/2025 | RSBU - Building Final | Passed |