Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
11/02/2021
Applicant:
Annette Suarez
Description:
Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for

Permit Reviews

Permit Number - T21CM08623
Permit Status: Complete
Permit Description: Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for
Start Date Submittal Complete Date Status  
03/19/2022 RESUBMITTAL 05/16/2022 COMPLETED Review Details
05/24/2022 RESUBMITTAL 06/03/2022 COMPLETED Review Details
06/22/2022 RESUBMITTAL 08/01/2022 COMPLETED Review Details
11/02/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 12/09/2021 COMPLETED Review Details
12/07/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/08/2023 APPROVED Review Details

Conditions

Permit Number - T21CM08623
Permit Status: Complete
Permit Description: Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for
Date Description Comments
12/08/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
06/24/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/24/2022 SHOP DRAWINGS REQUIRED FOR SPRINKLERS
08/01/2022 Prior to permit issuance a General Contractor Letter (GCL) is required
08/01/2022 DO NOT ISSUE THIS PERMIT UNTIL DP21-0263 HAS BEEN ISSUED.
12/08/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08623
Permite Description: Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
08/26/2023 COT - LCEL - Electrical Intermediate N/A Partial Pass 8.24/23: all electric in reception areas in pony wall framing.
08/18/2023 COT - HCBU - Interior Shear Bracing N/A Not Ready 8/1823: still hanging rock, not ready for inspection.
11/30/2023 PDSD Building Division - Sign Final N/A Not Applicable
11/09/2023 COT - FCON - Sprinkler - Final N/A Partial Pass Ok for hard lid.
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08623
Permit Description: Construction of a new one story building of 9,015 s.f. with an interior build out of 2,752 s.f. for
Total Completed Inspections - 29
Date Description Inspector Results Comments
08/11/2023 COT - LCPL - Plumbing Above Ceiling Passed
08/11/2023 COT - LCME - Mechanical Intermediate Passed
08/11/2023 COT - LCPL - Plumbing Intermediate Passed
08/11/2023 COT - LCBU - Building Progress Passed
08/28/2023 COT - LCBU - Framing Passed
08/28/2023 COT - LCEL - Electrical Above Ceiling Passed
09/13/2023 COT - HCME - Mechanical Intermediate Passed
09/13/2023 COT - LCEL - Electrical Intermediate Passed
09/13/2023 COT - HCPL - Plumbing Intermediate Passed
11/06/2023 BULD - Electrical Clearance Passed 11/6/23: TEP ECO 10042 E Old Vail Rd, Suite 160. SES 400A
11/09/2023 COT - LCBU - Building Above Ceiling Passed
11/09/2023 COT - LCEL - Electrical Progress Passed
11/09/2023 COT - LCPL - Plumbing Progress Passed
11/09/2023 COT - LCME - Mechanical Above Ceiling Passed
11/09/2023 COT - LCME - Mechanical Progress Passed
11/09/2023 COT - LCBU - Preslab Passed
11/09/2023 COT - HCEL - Electrical Underground Passed
11/09/2023 COT - HCBU - Interior Shear Bracing Passed
11/30/2023 COT - LCEL - Electrical Final Passed
12/01/2023 COT - FCON - Sprinkler - Final Passed
12/04/2023 COT - LCPL - Plumbing Final Passed
12/04/2023 COT - LCME - Mechanical Final Passed
12/05/2023 COT - FCON - Alarm - Final Passed
12/06/2023 COT - FCON - Fire - Final Passed
12/12/2023 TRSP - ROW - Final/Close-Out Passed
12/13/2023 COT - LCBU - Building Final Passed All tenant improvements are completed. Okay to issue Level 4 Certificate of Occupancy, once everyone has completed their final inspections.
12/13/2023 PDSD Site/Engineering Division - NPPO Passed
01/23/2024 ENGR Engineering Final Passed
01/23/2024 PDSD Site/Engineering Division - Landscaping Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
22-017 TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
22-017 WATER CHLORINATION REPORT-2023-12-07_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMPLIANCE_CERT.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SOILS_REPORT.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
STRUCTURAL_CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COMPLIANCE CERT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW