Permit: T21CM08617
Permit Details
Apply Date:
11/02/2021
Applicant:
Description:
booster station, wet well, electrical building, wall and fence modifications
Permit Reviews
Permit Number - T21CM08617
Permit Status: Complete
Permit Description: booster station, wet well, electrical building, wall and fence modifications
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/06/2022 | RESUBMITTAL - TI ALL | 02/02/2022 | COMPLETED |
02/07/2022 | RESUBMITTAL | 03/16/2022 | COMPLETED |
11/02/2021 | COMMERCIAL - TI | 11/26/2021 | COMPLETED |
02/02/2023 | COMMERCIAL REVIEW - FULL v.1 | 02/06/2023 | REQUIRES RESUBMIT |
11/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/22/2023 | APPROVED |
02/16/2023 | COMMERCIAL REVIEW - FULL v.2 | 03/01/2023 | APPROVED |
Conditions
Permit Number - T21CM08617
Permit Status: Complete
Permit Description: booster station, wet well, electrical building, wall and fence modifications
Date | Description | Comments |
---|---|---|
11/11/2021 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
11/11/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
11/11/2021 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
11/11/2021 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
11/11/2021 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
11/11/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
11/11/2021 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
11/11/2021 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
11/11/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
11/11/2021 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM08617
Permite Description: booster station, wet well, electrical building, wall and fence modifications
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/06/2022 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Canceled | {Activity date: 06/06/2022; Status: Not Applicable; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NA} |
11/01/2022 | COT - LCBU - Masonry Pregrout | N/A | Partial Pass | Partial for 1st lift of the West perimeter wall, okay to grout progress areas |
12/01/2022 | COT - LCME - Mechanical Intermediate | N/A | Not Ready | |
02/17/2023 | COT - LCEL - Outdoor Lighting | N/A | Not Ready | |
10/04/2023 | COT - LCEL - Construction Power | N/A | Not Applicable | |
09/29/2023 | COT - LCBU - Building Final | N/A | Partial Pass | 9/29/23 need concrete stoop at side door |
03/24/2023 | COT - HCBU - CofO | N/A | Partial Pass | Approval recommended for TCO level 2 (staff and training only) |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM08617
Permit Description: booster station, wet well, electrical building, wall and fence modifications
Total Completed Inspections - 18
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/23/2022 | COT - LCBU - Framing | Passed | {Activity date: 06/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved roof frame and decking per Special Inspection} ; {Activity date: 06/20/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial roof beams are in place} | |
07/28/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 05/20/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for the electric building, okay for concrete placement} ; {Activity date: 05/10/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for the electric building, okay for concrete placement} ; {Activity date: 03/23/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial for (4) pump can foundations, okay to pour progress areas} | |
07/28/2022 | COT - LCBU - Preslab | Passed | {Activity date: 07/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 05/19/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for the Electric Building, okay for concrete placement } |
|
10/05/2022 | COT - LCEL - Electrical Underground | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to backfill} ; {Activity date: 06/22/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for conduits to Booster cans, okay for slurry placement} ; {Activity date: 04/20/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval within building footprint } |
|
11/03/2022 | COT - LCBU - Masonry Pregrout | Passed | ||
12/01/2022 | COT - LCEL - Electrical Above Ceiling | Passed | inspection is n/a | |
12/02/2022 | COT - LCBU - Building Progress | Passed | ||
01/24/2023 | BULD - Electrical Clearance | Passed | Approved for temporary power at permanent service location , TEC Clearance to TEP is required to energize | |
01/24/2023 | COT - LCEL - Electrical Progress | Passed | SES | |
01/24/2023 | COT - LCEL - Temporary Service | Passed | Approved for temporary power at permanent service location , TEC Clearance to TEP is required to energize | |
02/08/2023 | COT - LCME - Mechanical Intermediate | Passed | mechanical is completed. all ductwork in place with registers. | |
02/22/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
03/24/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
03/24/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
09/29/2023 | COT - LCME - Mechanical Final | Passed | ||
09/29/2023 | COT - LCEL - Electrical Final | Passed | ||
10/04/2023 | COT - LCBU - Building Final | Passed | ||
10/05/2023 | COT - HCBU - CofO | Passed |