Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
8735 E 21ST ST
Address NEW:
8735 E 21ST ST
Apply Date:
11/01/2021
Applicant:
Description:
SFR Remodel and Addition

Permit Reviews

Permit Number - T21CM08603
Permit Status: Issued
Permit Description: SFR Remodel and Addition
Start Date Submittal Complete Date Status  
11/30/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 12/13/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM08603
Permit Status: Issued
Permit Description: SFR Remodel and Addition
Total Outstanding Activity Conditions - 1
Date Name
12/01/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM08603
Permite Description: SFR Remodel and Addition
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/26/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready
10/26/2022 COT - RSPL - Gas Pressure Test N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
03/24/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 3-24-23: 1-Load roof tile. 2-Provide test for water piping, to include shower steamer in Master Bathroom. 3-Complete electrical work at service. 4-Protect Romex running through combustion air vent. 5-Seal fireblocking. 6-Provide test for DWV piping. 7-Complete wiring in hallway. 8-Receptacles missing on both sides of SGD in great room. 9-Install nail plates per Code. 10-Install light by front door. 11-Receptacles can not be in bathtub area.
10/05/2023 COT - RSME - Mechanical Final N/A Not Ready 10/5/23: needed extension on permit not ready for mechanical final
11/08/2023 RSBU - Building Final N/A Re-inspection required 11/8/23: install glazing at steam shower, verify driveway material.

Completed Inspections

Permit Status: Issued
Permit Number: T21CM08603
Permit Description: SFR Remodel and Addition
Total Completed Inspections - 10
Date Description Inspector Results Comments
02/03/2022 BULD - Electrical Clearance Passed {Activity date: 02/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CODE ECO}
03/22/2022 COT - RSPL - Rough Soil Passed {Activity date: 03/22/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved ok to cover, to 5ft outside of house

}
04/20/2022 COT - RSBU - Preslab Passed {Activity date: 04/20/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 04/11/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Eastern third.}
04/20/2022 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 04/20/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 04/11/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Eastern third.}
04/20/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 04/20/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP including Ufer and underslab electrical.} ; {Activity date: 04/11/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -PA. Eastern third.}
10/07/2022 COT - RSBU - Roof Nailing Passed {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
10/20/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE INCR}
10/20/2022 COT - RSEL - Service Upgrade Passed {Activity date: 10/20/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap

Clear incr

Part of building rebuild.}
01/04/2023 COT - LCBU - Framing Passed
11/14/2023 COT - BULD - SWG Clearance Passed Clearance for SOUTHWEST GAS. 11/14/2023
11/15/2023 sent clearance by email

Documents

File Name Document Type  
MANUAL-J.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
FIREPLACE.PDF DOCUMENTS VIEW
FIRE HYDRANTS.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
PERMIT.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
MODEL FIRE FLOW.PDF DOCUMENTS VIEW
MODEL FIRE FLOW.PDF DOCUMENTS VIEW