Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 03/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 3-24-23: 1-Load roof tile. 2-Provide test for water piping, to include shower steamer in Master Bathroom. 3-Complete electrical work at service. 4-Protect Romex running through combustion air vent. 5-Seal fireblocking. 6-Provide test for DWV piping. 7-Complete wiring in hallway. 8-Receptacles missing on both sides of SGD in great room. 9-Install nail plates per Code. 10-Install light by front door. 11-Receptacles can not be in bathtub area. | |
| 04/04/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 3-24-23: 1-Load roof tile. 2-Provide test for water piping, to include shower steamer in Master Bathroom. 3-Complete electrical work at service. 4-Protect Romex running through combustion air vent. 5-Seal fireblocking. 6-Provide test for DWV piping. 7-Complete wiring in hallway. 8-Receptacles missing on both sides of SGD in great room. 9-Install nail plates per Code. 10-Install light by front door. 11-Receptacles can not be in bathtub area. April 4th: fire-block top of duct chase in garage,install outlet at slider,UF cable required in underground conduit,make up sub-panels |