Permit: T21CM08582
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4267 N 4TH AV BLDG 6
Address NEW:
4267 N 4TH AV BLDG 6
Apply Date:
11/01/2021
Applicant:
Description:
TownhomesBuilding 6
Permit Reviews
Permit Number - T21CM08582
Permit Status: Complete
Permit Description: TownhomesBuilding 6
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2022 | RESUBMITTAL | 05/09/2022 | COMPLETED |
| 05/12/2022 | RESUBMITTAL | 05/19/2022 | COMPLETED |
| 06/04/2022 | RESUBMITTAL | 06/15/2022 | COMPLETED |
| 11/01/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 12/08/2021 | COMPLETED |
| 01/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/22/2024 | REQUIRES RESUBMIT |
| 01/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/02/2024 | APPROVED |
| 01/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/18/2024 | APPROVED |
| 03/18/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/24/2023 | APPROVED |
Conditions
Permit Number - T21CM08582
Permit Status: Complete
Permit Description: TownhomesBuilding 6
| Date | Description | Comments |
|---|---|---|
| 06/14/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 06/14/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 06/14/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 06/14/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/14/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 06/15/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 02/02/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/23/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM08582
Permite Description: TownhomesBuilding 6
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/25/2023 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
| 10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 12/26/2023 | RSEL - Electrical Progress | N/A | Not Ready | |
| 06/21/2023 | RSPL - Plumbing Progress | N/A | Partial Pass | for yard water line ok to cover |
| 10/24/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Not Ready | |
| 03/13/2024 | RSBU - Building Final | N/A | Re-inspection required | 3/13/24: hosebib and vacuum breaker missing at west unit, water hammer arrestor missing at dishwasher, shut-off valve missing at YWL at west unit,electrical at west end unit water heater not made up, clean out need to be cut back and capped at laundry room. ALL UNITS AT BUILDING 6 |
| 03/13/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 3/13/24: hosebib and vacuum breaker missing at west unit, water hammer arrestor missing at dishwasher, shut-off valve missing at YWL at west unit,electrical at west end unit water heater not made up, clean out need to be cut back and capped at laundry room. ALL UNITS AT BUILDING 6 |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM08582
Permit Description: TownhomesBuilding 6
Total Completed Inspections - 34
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2023 | COT - LCPL - Backwater Valve | Passed | ||
| 03/08/2023 | COT - RSPL - Sewer | Passed | Approved sewer connection to HCS for building 6 | |
| 03/08/2023 | COT - RSPL - Rough Soil | Passed | building 6 | |
| 03/22/2023 | COT - RSBU - Preslab | Passed | Approved, SI required for PT foundation/slab | |
| 03/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/22/2023 | COT - RSEL - Grounding/Bonding | Passed | ufer | |
| 04/26/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 04/26/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/13/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 10/13/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 10/13/2023 | COT - LCBU - Framing | Passed | ||
| 10/13/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 10/13/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 10/13/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 10/26/2023 | COT - LCPL - Plumbing Intermediate | Passed | 9/15/23: canceled by Michael 10/13/23: leaking coupling in unit 602 at stairwell, leaking tub in unit 601, leaking fire sprinkler in unit 602. 10/26/23: corrections made |
|
| 12/19/2023 | COT - RSBU - Interior Shear Bracing | Passed | Rest of the units. Approved. 12/19/2023 | |
| 01/02/2024 | BULD - Electrical Clearance | Passed | Clear for TEP ECO. Unit #601, #602, #603, #604, and #605. 1/2/2024 | |
| 02/01/2024 | COT - FCON - Alarm - Final | Passed | This was already approved by tucson fire. | |
| 02/01/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 02/01/2024 | COT - FCON - Fire - Final | Passed | ||
| 03/13/2024 | COT - RSME - Mechanical Final | Passed | ||
| 03/13/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
| 03/13/2024 | COT - LCBU - Sustainability | Passed | ||
| 03/13/2024 | RSEL - Electrical Progress | Passed | ||
| 03/13/2024 | RSME - Mechanical Progress | Passed | ||
| 03/13/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 03/13/2024 | RSPL - Plumbing Progress | Passed | ||
| 03/13/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 03/13/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 03/13/2024 | COT - LCBU - Building Progress | Passed | ||
| 03/13/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/14/2024 | RSBU - Building Final | Passed | 3/13/24: hosebib and vacuum breaker missing at west unit, water hammer arrestor missing at dishwasher, shut-off valve missing at YWL at west unit,electrical at west end unit water heater not made up, clean out need to be cut back and capped at laundry room. ALL UNITS AT BUILDING 6 3/14/24: corrections made. |
|
| 03/14/2024 | COT - RSEL - Electrical Final | Passed | 3/13/24: hosebib and vacuum breaker missing at west unit, water hammer arrestor missing at dishwasher, shut-off valve missing at YWL at west unit,electrical at west end unit water heater not made up, clean out need to be cut back and capped at laundry room. ALL UNITS AT BUILDING 6 3/14/24: corrections made. |
|
| 03/14/2024 | COT - RSPL - Plumbing Final | Passed | 3/13/24: hosebib and vacuum breaker missing at west unit, water hammer arrestor missing at dishwasher, shut-off valve missing at YWL at west unit,electrical at west end unit water heater not made up, clean out need to be cut back and capped at laundry room. ALL UNITS AT BUILDING 6 3/14/24: corrections made. |