Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 03/13/2024 | RSBU - Building Final | Re-inspection required | 3/13/24: hosebib and vacuum breaker missing at west unit, water hammer arrestor missing at dishwasher, shut-off valve missing at YWL at west unit,electrical at west end unit water heater not made up, clean out need to be cut back and capped at laundry room. ALL UNITS AT BUILDING 6 | |
| 03/14/2024 | RSBU - Building Final | Passed | 3/13/24: hosebib and vacuum breaker missing at west unit, water hammer arrestor missing at dishwasher, shut-off valve missing at YWL at west unit,electrical at west end unit water heater not made up, clean out need to be cut back and capped at laundry room. ALL UNITS AT BUILDING 6 3/14/24: corrections made. |