Permit: T21CM08533
Permit Details
Apply Date:
10/29/2021
Applicant:
Andrea Flood
Description:
SFR F40J19 T19-M0035
Outstanding Activity Conditions
Permit Number - T21CM08533
Permit Status: Issued
Permit Description: SFR F40J19 T19-M0035
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/12/2021 | ISSUED WITH PCRWRD CONDITIONS:NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM08533
Permite Description: SFR F40J19 T19-M0035
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2022 | COT - RSME - Mechanical Final | N/A | Re-inspection required | correctly insulate line sets |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM08533
Permit Description: SFR F40J19 T19-M0035
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/07/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 01/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/07/2022 | COT - RSPL - Sewer | Passed | {Activity date: 01/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 01/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
01/20/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 01/20/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
01/20/2022 | COT - RSBU - Preslab | Passed | {Activity date: 01/20/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
01/20/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 01/20/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
01/20/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 01/20/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} | |
03/01/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 03/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
03/02/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 03/02/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval 13 sheer wall nailing pattern at second story not correct back, one header on first floor missing nail strap, no backing for stair rails} | |
07/29/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/27/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE 1. Incorrect lags used in stud shoes, incorrect size of stud shoe 2. Gas pressure test fail 3. Anchor bolts required within 12” of end of plate 4. Block under staid landing at floor joint 5. Insulate behind tub 6.maintain 10’ clearance between vent and fresh air intake 7. Repair abandoned fresh air hole in roof} |
|
07/29/2022 | COT - LCBU - Framing | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/27/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} | |
07/29/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/27/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} | |
07/29/2022 | RSME - Mechanical Progress | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/27/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} | |
07/29/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/27/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} | |
08/12/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 08/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/03/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO} | |
10/03/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP TEP ECO} |
|
10/18/2022 | COT - RSPL - Plumbing Final | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP SWG clearance required} ; {Activity date: 11/12/2021; Status: Prior to Final Inspectn; Inspector: AHOLLIS; Comment: Entered by AHOLLIS1 - ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD} |
|
10/18/2022 | COT - BULD - SWG Clearance | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE GAS} | |
10/26/2022 | FCON – OH Piping & Hydro | Passed | ||
11/08/2022 | RSBU - Building Final | Passed | ||
11/08/2022 | COT - RSEL - Electrical Final | Passed |