Permit: T21CM08393
Permit Details
Apply Date:
10/25/2021
Applicant:
Description:
Construction of a new restaurant with drive thru canopies and a dumpster enclosure
Permit Reviews
Permit Number - T21CM08393
Permit Status: Complete
Permit Description: Construction of a new restaurant with drive thru canopies and a dumpster enclosure
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/24/2022 | RESUBMITTAL | 02/05/2022 | COMPLETED |
02/12/2022 | RESUBMITTAL | 03/30/2022 | COMPLETED |
06/29/2022 | REVISION - - 1ST | 08/04/2022 | COMPLETED |
10/25/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 01/04/2022 | COMPLETED |
03/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/21/2023 | APPROVED |
03/07/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/15/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T21CM08393
Permit Status: Complete
Permit Description: Construction of a new restaurant with drive thru canopies and a dumpster enclosure
Date | Description | Comments |
---|---|---|
03/01/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
03/01/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
03/01/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/01/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
03/01/2022 | SHOP DRAWINGS REQUIRED FOR SIGNAGE. | |
03/01/2022 | SHOP DRAWINGS REQUIRED FOR FIRE SPRINKLER. | |
03/01/2022 | SHOP DRAWINGS REQUIRED FOR FIRE ALARM. | |
03/01/2022 | SHOP DRAWINGS REQUIRED FOR HOOD SUPRESSION. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM08393
Permite Description: Construction of a new restaurant with drive thru canopies and a dumpster enclosure
Total Outstanding Inspections - 14
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - LCBU - Building Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Underground | N/A | Not Ready | |
10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
11/23/2022 | COT - LCBU - Building Progress | N/A | Not Ready | Superintendent not on job site - 1428 hours. Could not perform requested inspection. |
02/22/2023 | COT - LCBU - Sustainability | N/A | Not Applicable | |
11/15/2022 | COT - LCEL - Outdoor Lighting | N/A | Partial Pass | Partial for underground electric, footings and UFER at light poles |
10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
03/09/2023 | COT - LCPL - Backwater Valve | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
03/14/2023 | COT - HCBU - CofO | N/A | Partial Pass | recommended for C/O |
03/13/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | 1. Ok for Level 4 TCO. 2. Will need to install Locking Knox Caps to FDC. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM08393
Permit Description: Construction of a new restaurant with drive thru canopies and a dumpster enclosure
Total Completed Inspections - 29
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/20/2022 | COT - LCBU - Preslab | Passed | {Activity date: 07/20/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover} | |
07/20/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 07/20/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
07/27/2022 | COT - LCPL - Sewer | Passed | {Activity date: 07/27/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for grease line to grease trap, and 6” sanitary line connected to on-site main from building, okay to backfill all progress areas} ; {Activity date: 07/21/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready} | |
08/12/2022 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
08/12/2022 | COT - LCBU - Roof Nailing | Passed | {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
10/03/2022 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/30/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for walk in area only } ; {Activity date: 09/12/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - NR Roof and walls required to be dried in before interior MPE inspections.} |
|
10/03/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} | |
10/03/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/30/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for walk in area only } ; {Activity date: 09/12/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - NR Roof and walls required to be dried in before interior MPE inspections.} |
|
10/03/2022 | COT - LCME - Mechanical Intermediate | Passed | {Activity date: 10/03/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} | |
11/15/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
11/15/2022 | COT - BULD - SWG Clearance | Passed | Approved, please send Clearance to SWG for the new meter set | |
11/17/2022 | COT - LCEL - Electrical Progress | Passed | secondary lines from SES to interior panels | |
11/17/2022 | BULD - Electrical Clearance | Passed | New 800A service, ECO Clearance to TEP is required | |
12/05/2022 | COT - LCBU - Building Progress | Passed | Approved awning pier foundations, okay for concrete placement | |
02/22/2023 | COT - LCME - Mechanical Progress | Passed | ||
02/22/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
03/02/2023 | COT - LCME - Mechanical Final | Passed | ||
03/02/2023 | COT - LCPL - Plumbing Roof Drains | Passed | ||
03/02/2023 | COT - LCEL - Electrical Final | Passed | ||
03/09/2023 | COT - LCPL - Rough Soil | Passed | ||
03/09/2023 | COT - LCPL - Plumbing Final | Passed | ||
03/09/2023 | COT - LCPL - Plumbing Progress | Passed | ||
03/13/2023 | COT - FCON - Sprinkler - Final | Passed | ||
03/13/2023 | COT - FCON - Alarm - Final | Passed | ||
03/13/2023 | COT - FCON - Hood System - Final | Passed | ||
03/13/2023 | COT - LCME - Kitchen Hood | Passed | ||
03/14/2023 | ENGR Engineering Final | Passed | ||
03/14/2023 | COT - LCBU - Building Final | Passed | ||
03/14/2023 | COT - FCON - Fire - Final | Passed |