Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
8707 E BEARS PATH RD
Apply Date:
10/26/2021
Applicant:
Danny Roth
Description:
New ground-up dance studio building shell and interior. Architectural, structural, mechanical, plumb

Permit Reviews

Permit Number - T21CM08392
Permit Status: Complete
Permit Description: New ground-up dance studio building shell and interior. Architectural, structural, mechanical, plumb
Start Date Submittal Complete Date Status  
05/24/2022 3RD PARTY REVIEW - COMMERCIAL 06/15/2022 COMPLETED Review Details
10/26/2021 3RD PARTY REVIEW - COMMERCIAL 04/13/2022 COMPLETED Review Details
05/12/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/15/2023 APPROVED Review Details

Conditions

Permit Number - T21CM08392
Permit Status: Complete
Permit Description: New ground-up dance studio building shell and interior. Architectural, structural, mechanical, plumb
Date Description Comments
04/13/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/13/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
04/13/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
04/13/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/13/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/13/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/13/2022 SHOP DRAWINGS REQUIRED FOR PREMANUFACTURED WOOD TRUSSES.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08392
Permite Description: New ground-up dance studio building shell and interior. Architectural, structural, mechanical, plumb
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Masonry Pregrout N/A Not Ready
02/02/2023 COT - LCEL - Construction Power N/A Not Applicable N/A
02/02/2023 BULD - Electrical Clearance N/A Not Applicable Sent on Electrical Clearance inspection.
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
01/05/2023 COT - LCEL - Electrical Above Ceiling N/A Not Ready
03/30/2023 COT - LCBU - Building Final N/A Re-inspection required Restroom lavatory not ADA compliant, type all panel schedules, provide a ladder to access roof mechanical units, site engineering and fire have not signed off
10/26/2022 COT - LCPL - Medical Gas Preconstruction Mtg N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08392
Permit Description: New ground-up dance studio building shell and interior. Architectural, structural, mechanical, plumb
Total Completed Inspections - 31
Date Description Inspector Results Comments
07/22/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 07/22/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. 3/0 copper.}
08/10/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 08/10/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Approved}
08/31/2022 COT - LCEL - Electrical Underground Passed {Activity date: 08/31/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/30/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Not Ready.}
08/31/2022 COT - LCPL - Rough Soil Passed {Activity date: 08/31/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/30/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Not Ready.}
09/01/2022 COT - LCBU - Preslab Passed {Activity date: 09/01/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/30/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Not Ready.}
11/15/2022 COT - LCBU - Framing Passed
11/15/2022 COT - HCBU - Exterior Clips/Sheathing Passed
11/15/2022 COT - LCBU - Exterior Clips/Sheathing Passed
11/15/2022 COT - LCBU - Roof Nailing Passed
01/05/2023 COT - HCEL - Electrical Underground Passed conduit from transformer to service approved to cover.
01/05/2023 COT - LCPL - Plumbing Intermediate Passed
01/05/2023 COT - LCPL - Plumbing Above Ceiling Passed
01/06/2023 COT - LCEL - Electrical Intermediate Passed
01/06/2023 COT - LCME - Mechanical Intermediate Passed
02/02/2023 COT - HCBU - Interior Shear Bracing Passed
02/03/2023 COT - LCEL - Electrical Reconnect Passed
03/06/2023 COT - LCPL - Sewer Passed
03/09/2023 COT - LCPL - Backwater Valve Passed
03/30/2023 COT - LCBU - Sustainability Passed
03/30/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
03/30/2023 COT - LCME - Mechanical Above Ceiling Passed
03/30/2023 COT - LCEL - Electrical Above Ceiling Passed
03/30/2023 COT - LCBU - Building Above Ceiling Passed
03/30/2023 COT - LCEL - Outdoor Lighting Passed
04/05/2023 COT - LCBU - Building Final Passed
04/05/2023 COT - LCEL - Electrical Final Passed
04/05/2023 COT - LCPL - Plumbing Final Passed
04/05/2023 COT - LCME - Mechanical Final Passed
04/13/2023 COT - FCON - Alarm - Final Passed
04/13/2023 COT - FCON - Sprinkler - Final Passed
04/20/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STANTEC PSA 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SUBMITTAL REQUIREMENT CHECKLIST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
SIC BEAR CANYON DANCE STUDIO-2023-05-11_V1.PDF DOCUMENTS VIEW